Pretty Road Bridge over Black Creek Closure Notice

BRIDGE CLOSURE NOTICE
To Landowners In Affected Areas
At the recommendation of the Township’s Bridge Inspection Engineer, the Township will be closing the Pretty Road Bridge over Black Creek until rehabilitation has been completed in 2020. At this time, the bridge is considered past its life expectancy and can no longer remain in service.
Detailed design for this structure is complete and tendering is planned for early 2020. Ideally, the rehabilitation will commence in the early spring, however, factors including weather and contractor availability may extend the preferred start date.
The Township of St. Clair sincerely apologizes for this inconvenience. This action is being taken to protect public safety, which will always be the Township’s highest concern.
If you have any questions, comments or concerns, please contact the undersigned. Thank you for your co-operation.
Paul daSilva, CET
Coordinator of Engineering
Township of St. Clair
(519) 867-2125

News

Winter Parking By-Law

Winter Parking By-Law will be in effect from 1:00am-7:00am, December 1 – April 1.   Click Here for B-L 22 of 2023 – Comprehensive Parking By-Law

Read More »

Flags at Half Mast

September 10, 2024 – The flag in front of the St. Clair Township Civic Centre, Mooretown Sports Complex and Emergency Services are lowered to half-mast in memory of the late Jim DeGurse. DeGurse was elected Councillor with St. Clair Township for 20 years (1998-2006 & 2010-2022). DeGurse passed away on September 9, 2024.

Read More »
Scroll to Top