2025 CAPITAL BUDGET AGENDA
FOR THURSDAY, NOVEMBER 28, 2024
1. Opening Remarks – John Rodey, CAO 4:00 – 4:10
– George Lozon, Treasurer
2. Capital Budget
A) Community Services Presentation 4:10 – 5:10
B) Fire Department Presentation 5:10 – 5:30
C) Public Works Presentation 5:30 – 6:45
3. Capital Budget Wrap-up 6:45 – 7:00
REPORT
MEETING TO BE CONSIDERED: November 28, 2024
DATE: November 18, 2023
TO: Mayor Jeff Agar & St. Clair Township Council John Rodey, CAO
Jeff Baranek, Clerk
FROM: George Lozon, CPA Treasurer
RE: 2025 Capital Budget
Recommendation: Be it resolved that the initial 2025 capital budget financial package be received for review and discussion.
We recommend Council review and discuss in detail the capital projects and financing since it affects future years especially since engineering studies and government approval are required.
We met with department heads to review their priorities for the 2025 capital budget. The department heads provided functional capital budget sheets and an overview based on their responsibility which can be found under the project number tabs. A summary of the prioritized projects for the year 2024 is attached on exhibit A1 to A4 along with the projected reserves on exhibit B. The bolded lines in exhibit A2 to A4 represent the suggested approved projects, and column I represents the total which is reflected on the 2024 budget summary page (exhibit A1). The initial budget contains an incremental increase of $718,444 (exhibit A1, Column K, Line 50) over the 2024 approved capital budget.
Please note that the taxation levy after grants is being returned to the approximate level that we had in 2021 and 2022 (Taxation Levy after Grants, exhibit A1, row 48.) The 2023 taxation levy was reduced by using $1,000,000 of the the Moore Industrial Park Reserve.
Our grants are increasing by $409,896 and $19,203 for OCIF (Ontario Community Infrastructure Fund) and CCBF (Canada Community Building Fund formerly AMO Gas
Tax.) We’ve allocated the entire thing to the public works department because most of these grants must be spent on infrastructure projects with a few exceptions. We have used debt to keep the public works department, after taking into account the increased grants, to not be using any additional tax money (i.e., the total tax increase in expenses for public works equals the $429,099 in increased grants.)
Should you have any questions pertaining to any aspect of the 2025 capital budget package please feel free to contact me.
Respectfully Submitted,
George Lozon, CPA Treasurer
John Rodey CAO
A G H I J K L M N
1 ST. CLAIR TOWNSHIP
2
3 NET CAPITAL FINANCING BUDGET SUMMARY 2021 to 2025
4 Year over Year Tax
5 2021 2022 2023 2024 2025 2024/2025 Percentage Rate
6 Approved Approved Approved Approved Proposed Change Increase Impact
8
9 Fire 511,743 503,743 468,150 693,880 969,024 275,144 39.65% 1.66%
10
11 Gen Adm. Information Technology – – 45,000 67,000 146,000 79,000 117.91% 0.48%
12
13 Asset Management – – – 110,000 90,000 (20,000) -18.18% -0.12%
14
15 Complex 150,000 150,000 403,549 777,182 792,182 15,000 1.93% 0.09%
16 Recreational Facilities 100,000 188,000 308,123 149,000 445,000 296,000 198.66% 1.79%
17 Community Services Equipment 90,000 90,000 91,653 90,000 90,000 – 0.00% 0.00%
18 Parks Facilities & Improvements 329,335 515,593 206,000 199,700 275,000 75,300 37.71% 0.46%
19
20 Golf – – – – – – n/a 0.00%
21 Campgrounds – – – – – – n/a 0.00%
22 Museum’s 33,500 – – 7,000 5,000 (2,000) -28.57% -0.01%
23
24 Roads 1,387,938 2,217,870 328,009 931,169 1,731,268 800,099 85.92% 4.83%
25
26 PW Operations Buildings 50,000 100,000 50,000 250,000 – (250,000) -100.00% -1.51%
27
28 Bridges 580,000 1,070,000 1,537,238 1,020,000 540,000 (480,000) -47.06% -2.90%
29
30 Culvert – – – – – – n/a 0.00%
31
32 Sidewalk – – – – – – n/a 0.00%
33 Storm 100,000 72,500 150,000 108,000 284,000 176,000 162.96% 1.06%
34 Trails, Erosion & Seawall 60,000 – – – – – n/a 0.00%
35 Street Lights/Signs 270,000 – 255,000 60,000 50,000 (10,000) -16.67% -0.06%
36
37 Drains 191,834 201,834 224,834 303,834 496,834 193,000 63.52% 1.17%
38
39 Total before Grants 3,854,350 5,109,540 4,067,556 4,766,765 5,914,308 1,147,543 24.07% 6.93%
40
41 Less: AMO GAS Tax Revenue (446,740) (446,740) (466,163) (460,881) (480,084) (19,203) 4.17% -0.12%
42 Less: AMO GAS top up unused 2021 (130,000) –
43 Less: OCIF Formula component (1,172,395) (2,257,316) (2,376,211) (2,732,643) (3,142,539) (409,896) 15.00% -2.48%
44 Less: Service Delivery grant – – –
46 Less: Transfer to Road reserves 40,269
47
48 Taxation Levy after Grants 2,275,484 2,275,484 1,225,182 1,573,241 2,291,685 718,444 45.67% 4.34%
49
50 2023 Yearly Incremental difference (Col I – Col H Line 46) (1,050,302) 348,059 718,444 Difference
51
52 Estimated Tax Rate Impact (based on 2023 total taxes, not including operating) 4.34% $ 59.82
53 Annual cost per single-family detatched not on water^^
54 Reserve Financing
55 Golf Course 180,000 250,000 307,655 310,000 310,000
56 Public Works-Equipment 593,000 1,335,000 75,000 243,000 243,000
57 Water 1,305,000 1,487,000 255,500 766,000 766,000
58 Sanitary 530,000 710,000 1,682,500 845,400 845,400
59
60 Total 2,608,000 3,782,000 2,320,655
A B C D E F G H I J K L N
1 Life Project External Revenue Total Rev Total Initial Educ & Dev.
2 ID # Depart. Description Yrs Cost Sources Reserves Fund Fund By Function Reserves Envir Chgs.
3
4 2025-04 Fire Operations Vehicles 10 120,000 120,000 – – Reserve Fire Vehicles 120,000
5 2025-08 Fire Fire Tanker 20 1,580,000 1,580,000 – – Reserve Fire Vehicles 1,580,000
6 2025-13 Fire Command Unit Upgrade 15 50,000 50,000 – – Ext Emergency Measures Ont Grant
7 2025-15 Fire Fire Station Condition Assessment 25 25,000 25,000 – – Res Fire Stn Facilities-Life Cycle 25,000
8 2025-02 Fire Life Cycle Budgeting Vehicles (Reserve Fire Vehicle) 600,024 100,000 21,000 479,024 479,024 Ext OMPF Grant, Development Charge 21,000
9 2025-11 Fire Gear Extractor and Dryers 30 176,000 60,000 116,000 595,024 External OFM Grant
10 2025-07 Fire Virtual Reality Training Simulator 20 130,000 130,000 725,024
11 2025-06 Fire Brigden Fire Station Parking Lot 25 150,000 150,000 875,024
12 2025-12 Fire Confined Space Equipment 15 60,000 60,000 935,024
13 2025-09 Fire Station 4 Apparatus Floor Repair 30 34,000 34,000 969,024
14 2025-14 Fire Fire Station IT Infrastructure Upgrades 5 45,000 45,000 – 969,024 Res Equipment Asset Management Plan 45,000
15 2025-10 Fire Station 2 Upgrades 20 20,000 20,000 – 969,024 Res Fire Stn Facilities-Life Cycle 20,000
16 2025-05 Fire Equipment Asset Management Plan 100,000 100,000 1,069,024
17 2025-03 Fire Asset Management Plan (Res Fire Stn Facilities-Life Cycle) 50,000 50,000 1,119,024
18 2025-01 Fire Radio Reserve 10,000 10,000 1,129,024
19
20 2025-15A ITNetwk Reorganize server & wiring cabinets (contractor) 15 10,000 10,000 – – Res-Equipment-General 10,000
21 2025-16 ITNetwk Two Conference Rooms & Council Chambers Upgrades 15 22,000 22,000 – – Res-Equipment-General 22,000
22 2025-17 ITNetwk IT Cabinet Locks throughout Township (12 x $4,000) 15 48,000 26,000 22,000 22,000 Development Charges 26,000
23 2025-18 ITNetwk General Township Networking Upgrades / Replacements 10 20,000 20,000 42,000
24 2025-19 ITNetwk General Twp Access Control System Phase 1 10 100,000 100,000 142,000
25 2025-19A ITNetwk TOMRMS-Record Retention & Management Program 4,000 4,000 146,000
26
27 2025-20 Complex Annual Reserve Contribution (Replacement Capital Complex) 200,000 50,000 150,000 150,000 External OMPF Grant
28 2024-21 Complex Rink Conversion Debt & Reserve Payment 179,682 179,682 329,682 Debt $144,682; Water Reserve $35,000
29 2025-21 Complex Parking Lot Increased Costs to Project 2024-27 from 2024 25 32,500 32,500 362,182
30 2025-22 Complex HRV’s 6 Increased Costs to Project 2024-30 from 2024 10 170,000 25,000 145,000 507,182 Res. Replacement Capital Complex 25,000
31 2025-23 Complex Lunch Room Completion 25 25,000 25,000 532,182
32 2025-24 Complex Pool Refurbishment (1/2 Grant Funded) 25 520,000 260,000 260,000 792,182 50% Grant Funded
33 2025-25 Complex New Fitness Equipment 10 30,000 30,000 822,182
34 2025-26 Complex Parking Lot at Back 25 500,000 500,000 1,322,182
35 2025-27 Complex Meeting Room #2-Redo 15 50,000 50,000 1,372,182
36 2025-28 Complex Pool Change Rooms 25 100,000 100,000 1,472,182
37 2025-29 Complex Keyless Entry 15 15,000 15,000 1,487,182
38
39 2025-30 Rec. Fac. Res Rec. Facilities Lifecycle Annual Contribution per AMP 150,000 50,000 100,000 100,000 Ext OMPF Grant
40 2025-31 Rec. Fac. Asbestos Removal Multiple Facilities 25 125,000 42,000 83,000 183,000 Development Charges 42,000
41 2025-31A Rec. Fac. Wilkesport Library Roof 20 20,000 20,000 203,000
42 2025-32 Rec. Fac. Civic Centre HVAC Controls 20 20,000 20,000 223,000
43 2025-33 Rec. Fac. Corunna Library Window Replacement 25 72,000 72,000 295,000
44 2025-34 Rec. Fac. Corunna Library – Façade Restoration 20 100,000 100,000 395,000
45 2025-35 Rec. Fac. IT Remodel Expansion at Emergency Services 20 50,000 50,000 445,000
46 2025-36 Rec. Fac. Shell Health Centre Paving 50 75,000 75,000 520,000 –
47 2025-37 Rec. Fac. Civic Centre Front Sign 20 15,000 15,000 535,000
48 2025-38 Rec. Fac. Port Lambton Hall Entrance & Sidewalk Repairs 25 20,000 20,000 555,000
49 2025-39 Rec. Fac. Emergency Services Front Façade & Eves 25 50,000 50,000 605,000
50 2025-40 Rec. Fac. Emergency Services Roof Top Access 40 120,000 120,000 725,000
51 2025-41 Rec. Fac. Corunna Library – Paving Parking Lot 25 45,000 45,000 770,000
52 2025-42 Rec. Fac. Shell Health Centre Front Vestibule Entrance 25 100,000 100,000 870,000
53 2025-43 Rec. Fac. Civic Centre Mens & Lower Washrooms 25 80,000 80,000 950,000
54 2025-44 Rec. Fac. Friendship Club Carpet 15 10,000 10,000 960,000
55 2025-45 Rec. Fac. All Facilities Gutter Guards 20 25,000 25,000 985,000
56
57 2025-47 M.Mus Shaw Exhibition Building Roof 25 – – – – Donation
58 2025-46 M.Mus Moore Museum: Pavillion 25 30,000 5,000 25,000 25,000 Fundraising 5 – 5
A B C D E F G H I J K L N
1 Life Project External Revenue Total Rev Total Initial Educ & Dev.
2 ID # Depart. Description Yrs Cost Sources Reserves Fund Fund By Function Reserves Envir Chgs.
59
60 2025-50 S.Mus Sombra Museum: Reserve for Collection Mgmt. Building 25 5,000 5,000 5,000 –
61 2025-50 S.Mus Painting of the Full Exterior of the Bury House 15 – – –
62
63 2025-51 Equip Vehicle & Equipment Reserve Build Up 125,500 35,500 90,000 90,000 External Grant OMPF
64 2025-52 Equip Arena – Zamboni 15 125,000 125,000 – 90,000 Vehicle & Equipment Reserve 125,000
65 2025-53 Equip Gator 15 25,000 25,000 115,000
66 2025-54 Equip Ball Diamond Groomer 15 10,000 10,000 125,000
67
68 2025-55 Prk Fac Willow River Washrooms 25 80,000 80,000 80,000
69 2025-56 Prk Fac Dugouts / Bleachers / Fences 25 75,000 75,000 155,000
70 2025-57 Prk Fac Play Ground Upgrade & Replace Resurfacing 10 60,000 60,000 215,000
71 2025-57A Prk Fac CAP Tennis/Pickle Ball Court Surfacing 10 40,000 40,000 255,000
72 2025-58 Prk Fac Park Signs Thoughout the Township 25 20,000 20,000 275,000
73 2025-59 Prk Fac Stewart Ball Park New Washrooms 30 50,000 50,000 325,000
74 2025-60 Prk Fac Wilkesport Drainage 50 50,000 50,000 375,000
75 2025-61 Prk Fac Brigden Lights 25 40,000 40,000 415,000
76 2025-62 Prk Fac Wilkesport Slpash Pad Repair 10 100,000 100,000 515,000
77 2025-63 Prk Fac Cement Pad at Port Lambton Pavilion 15 30,000 30,000 545,000
78 2025-64 Prk Fac CAP Basketball Courts 25 20,000 20,000 565,000
79 2025-65 Prk Fac Stewart Lights 10 51,000 51,000 616,000
80 2025-66 Prk Fac Wilkesport Lights 10 130,000 130,000 746,000
81 2025-67 Prk Fac O’Dell (Cameron Ball Park) Shed / Washroom 30 50,000 50,000 796,000
82 2025-68 Prk Fac Brander Park Breakwall Repair 50 50,000 50,000 846,000
83 2025-69 Prk Fac Courtright Main Diamond Lights 25 350,000 350,000 1,196,000
84 2025-70 Prk Fac Sombra Ball Park Playground 20 30,000 30,000 1,226,000
85 2025-71 Prk Fac Brander Pond Fountain 10 15,000 15,000 1,241,000
86 2025-72 Prk Fac Brigden Tennis Court Repair 10 10,000 10,000 1,251,000
87 2025-73 Prk Fac Paddock Green Playground 20 60,000 30,000 30,000 1,281,000 External Moore Optimist Donation
88
89 2025-75 Cmpgrnd Cathcart Campground Washroom Tiles 20 30,000 30,000 – – Res. Cathcart Campground 30,000
90 2025-74 Cmpgrnd Mooretown Campground Back Bathroom Roof 25 70,000 5,000 65,000 65,000 Res Mooretown Campground 5,000
91 2025-76 Cmpgrnd Branton Cundick Campground Playground 20 40,000 40,000 – 65,000 Res Branton Cundick Campground 40,000
92 2025-77 Cmpgrnd Mooretown Campground Front Washrooms 20 25,000 – 25,000 90,000 Res Mooretown Campground –
93 2025-78 Cmpgrnd Mooretown Campground Hydro Replacement 50 390,000 390,000 480,000
94
95 2023-81 Golf Clubhouse Refurbishment 30 3,500,000 3,500,000 – – Debt Financing
96 2025-79 Golf Bunker Program 50 50,000 50,000 – – Golf Reserves 50,000
97 2025-80 Golf Ten golf carts 15 67,500 67,500 – – Golf Reserves 67,500
98 2025-81 Golf Golf Cart GPS System 15 50,155 50,155 – – Golf Reserves 50,155
99 2025-82 Golf Tractor 20 40,000 40,000 – – Golf Reserves 40,000
100 2025-83 Golf Tees / Collars Mower 15 25,000 25,000 – – Golf Reserves 25,000
101 2025-84 Golf Greens / Tee Surrounds Mower 15 75,000 75,000 – – Golf Reserves 75,000
102 2025-85 Golf Tri-Fold Rough Mower 15 25,000 25,000 – – Golf Reserves 25,000
103
104 2024-99 ROADS To Pay Off Bridge 44 Reserve Borrowing (2023) 143,969 143,969 143,969
105 2025-100 ROADS Rural Surface Treatment 15 575,000 575,000 718,969
106 2025-101 ROADS Urban Asphalt Resurfacing 15 525,000 119,000 406,000 1,124,969 Development Charges 119,000
107 2025-102 ROADS Tom Street Sewer Relocation 25 1,748,000 925,701 246,000 576,299 1,701,268 Debt Financing;Reserve 246 246,000
108 2025-103 ROADS Steadman Street Reconstruction 25 30,000 30,000 1,731,268
109
110 2025-150 BRIDGES Bridge Rehabilitation & Maintenance (Reserves) 220,000 220,000 220,000
111 2025-151 BRIDGES Bridge 44 – St. Clair Parkway over Marshy Creek 100 3,520,000 3,200,000 320,000 540,000 PriorYear(2022-152)$3000;Reserve200 200,000
112 2025-152 BRIDGES Bridge 56 – Ward Line over Marshy Creek 100 2,500,000 2,500,000 – 540,000 Debt Financing
113
A B C D E F G H I J K L N
1 Life Project External Revenue Total Rev Total Initial Educ & Dev.
2 ID # Depart. Description Yrs Cost Sources Reserves Fund Fund By Function Reserves Envir Chgs.
114 2025-200 Storm Road Storm Culvert Replacements 50 100,000 100,000 100,000
115 2025-202 Storm Tom Street Sewer Relocation 75 184,000 184,000 284,000
116
117 2025-250 Drain Barnes Drain Debenture- 10 years Expires 2027 50 81,834 81,834 81,834
118 2025-251 Drain Hubbard Drain 50 300,000 275,000 25,000 – 81,834 External 260, Grant 15, Res (Prior Yr)
119 2025-252 Drain Gray Drain East 30 70,000 45,000 25,000 – 81,834 External 30, Grant 15, Res (Prior Year)
120 2025-253 Drain Parr Drain North-South Side of Brigden 75 80,000 40,000 40,000 121,834 External
121 2025-254 Drain Old River Road Drain – Along West Side of Old River Road 75 110,000 110,000 – 121,834 External
122 2025-255 Drain Henry Drain – Along North Side of Wilkesport Line 75 340,000 340,000 461,834 Grants
123 2025-256 Drain McDonald-Andrews Drain – Section 76 – Reassessment 75 230,000 230,000 – 461,834 External 170, Grants 60
124 2025-257 Drain McDonald Drain No. 2 75 50,000 50,000 – 461,834 External 33, Grant 17
125 2025-258 Drain Lapier Drain Branch Drain (Wilson) 75 50,000 30,000 20,000 481,834 Grants 17, External 33
126 2025-259 Drain Watson Creek Drain (Lower End) 75 20,000 20,000 – 481,834 External
127 2025-260 Drain Pacific Branch Drain (Pump) 75 180,000 130,000 35,000 15,000 496,834 Grants 42, External 88, Prior Yr 35
128 2025-261 Drain Campbell Drain (Brigden) 75 250,000 175,000 75,000 – 496,834 External , Reserve (Prior Year)
129 2025-262 Drain Eyre Branch Drain of Gray Drain 75 60,000 60,000 – 496,834 Grants 4, External 56
130
131 2025-300 Trails RE-asphalt Portion of River Trail 20 100,000 100,000 – – Res. Educ & Envir. 100,000
132
133 2025-301 Signs Township Entry Signs – Replacement 50 50,000 50,000 50,000
134 2025-302 Xwalk Pedestrian Crossover Improvement 20 200,000 200,000 250,000
135
136 2025-400 PW Equip Unit 42 Replacement 15 240,000 240,000 – – Res. PW Equipment (Prior Year)
137 2025-401 PW Equip 2 Pickup Truck Replacements 15 120,000 120,000 – – Res. PW Equipment/Dev. Charges 81,000 39,000
138 2025-402 PW Equip Street Sweeper Replacement 15 500,000 25,000 475,000 – – Trade In, Res. PW Equipment 475,000
139 2025-403 PW Equip Mower Attachments for New Tractor 10 75,000 75,000 – – Res. PW Equipment 75,000
140
141 2024-700 Asset Mgt Asset Management Plan Update 90,000 90,000 90,000
142
143 Total General 25,015,164 8,756,201 7,203,655 9,055,308 9,055,308 Totals (Doesn’t Include Prior Year) 3,456,655 100,000 247,000
144
145 2025-501 Wstwtr Tom Street Sewer Relocation 25 1,644,500 1,644,500 – – Res. Wastewater 1,644,500
146 2025-560 Wstwtr Baptist, Holt, & Brigden Main Pump Stn Rehabilitation 25 80,000 80,000 – – Res. Wastewater / Dev. Charges 38,000 42,000
147 2025-599 Wstwtr Courtright WWTP Expansion (Multi-Year 2025-2027) 50 46,400,000 46,400,000 – – Grants $33,872,000/Debt $12,528,000 –
148
149 Total Sanitary 48,124,500 46,400,000 1,724,500 – – 1,682,500 – 42,000
150
151 2024-600 Water Tom Street Sewer Relocation 75 287,500 287,500 – – Res. Water / Development Charges 255,500 32,000
152 2025-605 Water Nova St. Clair Water Service Installation 20 120,000 120,000 – – Res Water 120,000
153 2025-610 Water Brigden Water Tower Access Road & Storm Pipe Repairs 20 150,000 150,000 – – Res Water 150,000
154 2025-611 Water Pressure Monitoring Equipment 10 190,000 190,000 – – Res Water 190,000
155 2025-612 Water Water Meter Reading Equipment 10 55,000 55,000 – – Res Water 55,000
156
157 Total Water 802,500 – 802,500 – 770,500 – 32,000
158
159 Grand Total of all projects 73,942,164 55,156,201 9,730,655 9,055,308 5,909,655 100,000 321,000
160
161 Grand Total Proposed Projects 70,721,164 55,121,201 9,685,655 5,914,308 5,864,655 100,000 321,000
A B C D E F G H I J K L
1 Life Project External Revenue Total Total Initial Educ &
2 ID # Depart. Description Yrs Cost Sources Reserves Fund Revenue By Function Reserves Envir
3
4 2025-01 Fire Radio Reserve 10,000 10,000 10,000
5 2025-02 Fire Life Cycle Budgeting Vehicles (Res Fire Vehicle) 647,698 100,000 547,698 557,698 Grant OMPF
6 2025-03 Fire Asset Management Plan Facilities Life Cycle 50,000 50,000 607,698 Res Fire Stn Facilities-Life Cycle
7 2025-04 Fire Operations Vehicles 10 120,000 120,000 – 607,698 Reserve Fire Vehicles 120,000
8 2025-05 Fire Equipment Asset Management Plan 100,000 100,000 707,698
9
10 2025-15 ITNetwk Res Gen Equipment (Future IT Equipment) 5 100,000 100,000 100,000 Res Gen Equipt
11
12 2025-20 Complex Annual Reserve Contribution (Replacement Capital Complex) 200,000 50,000 150,000 150,000 External OMPF Grant
13 2025-24 Complex Pool Refurbishment (1/2 Grant Funded) 25 1,480,000 1,480,000 – 150,000 50% Grant Funded/50% Debenture
14 2024-21 Complex Rink Conversion Debt & Reserve Payment 179,682 179,682 329,682 Debt $144,682; Water Reserve $35,000
15
16 2025-30 Rec. Fac. Res Rec. Facilities Lifecycle Annual Contribution per AMP 150,000 50,000 100,000 100,000 Ext OMPF Grant
17 2025-31 Rec. Fac. Asbestos Removal Multiple Facilities 25 125,000 125,000 225,000
18 2025-32 Rec. Fac. Civic Centre HVAC Controls 20 200,000 200,000 425,000
19
20 2025-48 M.Mus Schoolhouse Roof 25 40,000 40,000 40,000 –
21
22 2025-50 S.Mus New HVAC System for the Bury House 15 – – –
23 2025-50 S.Mus Sombra Museum: Reserve for Collection Mgmt. Building 25 5,000 5,000 – – Res Sombra Museum 5,000
24
25 2025-51 Parks Vehicle & Equipment Reserve Build Up 125,500 35,500 90,000 90,000 Grant OMPF
26
27 2025-55 Prk Fac River Washrooms 25 80,000 80,000 80,000
28 2025-58 Prk Fac Park Signs Thoughout the Township 25 20,000 20,000 100,000
29 2025-68 Prk Fac Branker Park Breakwall Repair 50 50,000 50,000 150,000
30
31 2025-76 Cmpgrnd Cathcart Campground Playground 20 40,000 40,000 – – Res Cathcart Campground 40,000
32
33 2025-79 Golf Bunker Program 50 50,000 50,000 – – Golf Reserves 50,000
34 2025-81 Golf Golf Cart GPS System 15 42,852 42,852 – – Golf Reserves 42,852
35
36 2014-99 ROADS To Pay Off Bridge 44 Reserve Borrowing (2023) 143,969 143,969 143,969
37 2025-103 ROADS Steadman Street Reconstruction 25 410,000 410,000 553,969
38 2025-104 ROADS Duncan Street Reconstruction 25 220,000 220,000 773,969
39 2025-105 ROADS Water Street Seawall Replacement 50 1,870,000 1,870,000 2,643,969
40 2025-106 ROADS Polymoore Dr Rehab-North Branch to 675m South 25 550,000 550,000 3,193,969
41
42 2025-150 BRIDGES Bridge Rehabilitation & Maintenance (Reserves) 220,000 220,000 220,000
43 2025-153 BRIDGES Bridge 50-St. Clair Parkway over Marshy Crk 100 2,650,000 2,650,000 2,870,000
44 2025-154 BRIDGES Bridge 75-St. Clair Pkwy over Sweeny Drain 100 2,650,000 2,650,000 5,520,000
45
46 2025-200 Storm Road Storm Culvert Replacements 50 100,000 100,000 100,000 Storm reserves
47
48 2025-250 Drain Barnes Drain Debenture- 10 years Expires 2027 50 81,834 81,834 81,834
49 2025-253 Drain Parr Drain North-South Side of Brigden 75 500,000 80,000 420,000 501,834 External 70, Grant 10
50 2025-254 Drain Old River Road Drain – Along West Side of Old River Road 75 390,000 105,000 285,000 786,834 External
51 2025-255 Drain Henry Drain – Along North Side of Wilkesport Line 75 1,470,000 790,000 680,000 1,466,834 Grants 80, External 710
52 2025-259 Drain Watson Creek Drain (Lower End) 75 80,000 20,000 60,000 1,526,834 External
53
54 2025-300 Trails RE-asphalt Portion of River Trail 20 100,000 100,000 – – Res. Educ & Envir. 100,000
55 2025-302 Xwalk Pedestrian Crossover Improvement 20 115,000 115,000 115,000
56
57 2025-560 Wstwtr Baptist, Holt, & Brigden Main Pump Stn Rehabilitation 25 800,000 800,000 – – Res. Wastewater 800,000
58
59 2025-601 Water Duncan Street Watermain Replacement 75 200,000 200,000 – – Res Water 200,000
60
61 Grand Total 16,366,535 2,710,500 1,357,852 12,298,183 1,257,852 100,000
A B C D E F G H I J K L
1 Life Project External Revenue Total Total Initial Educ &
2 ID # Depart. Description Yrs Cost Sources Reserves Fund Revenue By Function Reserves Envir
3
4 2025-01 Fire Radio Reserve 10,000 10,000 10,000
5 2025-02 Fire Life Cycle Budgeting Vehicles (Res Fire Vehicle) 695,912 100,000 595,912 605,912 Grant OMPF
6 2025-03 Fire Asset Management Plan Facilities Life cycle 50,000 50,000 655,912 Res Fire Stn Facilities-Life Cycle
7 2025-04 Fire Operations Vehicles 10 120,000 120,000 – 655,912 Reserve Fire Vehicles 120,000
8 2025-05 Fire Equipment Asset Management Plan 100,000 100,000 755,912
9
10 2025-15 ITNetwk Res Gen Equipment (Future IT Equipment) 5 100,000 100,000 100,000 Res Gen Equipt
11
12 2025-20 Complex Annual Reserve Contribution (Replacement Capital Complex) 200,000 50,000 150,000 150,000 External OMPF Grant
13 2024-21 Complex Rink Conversion Debt & Reserve Payment 179,682 179,682 329,682 Debt $144,682; Water Reserve $35,000
14
15 2025-30 Rec. Fac. Res Rec. Facilities Lifecycle Annual Contribution per AMP 150,000 50,000 100,000 100,000 Ext OMPF Grant
16 2025-31 Rec. Fac. Asbestos Removal Multiple Facilities 25 125,000 125,000 225,000
17
18 2025-49 M.Mus Chapel Roof 25 25,000 25,000 25,000 Fundraising
19
20 2025-50 S.Mus Interior Paining of the Bury House, etc 15 – – –
21 2025-50 S.Mus Sombra Museum: Reserve for Collection Mgmt. Building 25 5,000 5,000 – – Res Sombra Museum 5,000
22
23 2025-51 Parks Vehicle & Equipment Reserve Build Up 125,500 35,500 90,000 90,000 Grant OMPF
24
25 2025-55 Prk Fac River Washrooms 25 80,000 80,000 80,000
26 2025-58 Prk Fac Park Signs Thoughout the Township 25 20,000 20,000 100,000
27 2025-68 Prk Fac Branker Park Breakwall Repair 50 50,000 50,000 150,000
28
29 2025-76 Cmpgrnd Mooretown Campground Playground 20 40,000 40,000 – – Res Mooretown Campground 40,000
30
31 2025-81 Golf Golf Cart GPS System 15 42,852 42,852 – – Golf Reserves 42,852
32
33 2014-99 ROADS To Pay Off Bridge 44 Reserve Borrowing (2023) 143,969 143,969 143,969
34 2025-100 ROADS Rural Surface Treatment 15 575,000 575,000 718,969
35 2025-101 ROADS Urban Asphalt Resurfacing 15 525,000 525,000 1,243,969
36 2025-105 ROADS Water Street Seawall Replacement 50 1,870,000 1,870,000 3,113,969
37 2025-107 ROADS Oil Springs Line-Hwy 40 to St. Clair Parkway 20 1,155,000 1,155,000 4,268,969
38
39 2025-150 BRIDGES Bridge Rehabilitation & Maintenance (Reserves) 220,000 220,000 220,000
40 2025-156 BRIDGES Bridge 97 – Rokeby Line over Thorton Drain 100 50,000 50,000 270,000
41
42 2025-200 Storm Road Storm Culvert Replacements 50 120,000 120,000 120,000
43
44 2025-250 Drain Barnes Drain Debenture- 10 years Expires 2027 50 70,596 70,596 70,596
45
46 2025-300 Trails RE-asphalt Portion of River Trail 20 120,000 120,000 – – Res. Educ & Envir. 120,000
47
48 Grand Total 6,968,511 235,500 327,852 6,405,159 207,852 120,000
A B C D E F G H I J K L
1 Life Project External Revenue Total Total Initial Educ &
2 ID # Depart. Description Yrs Cost Sources Reserves Fund Revenue By Function Reserves Envir
3
4 2025-01 Fire Radio Reserve 10,000 10,000 10,000
5 2025-02 Fire Life Cycle Budgeting Vehicles (Res Fire Vehicle) 743,856 100,000 643,856 653,856 Grant OMPF
6 2025-03 Fire Asset Management Plan Facilities Life cycle 50,000 50,000 703,856 Res Fire Stn Facilities-Life Cycle
7 2025-04 Fire Operations Vehicles 10 120,000 120,000 – 703,856 Reserve Fire Vehicles 120,000
8 2025-05 Fire Equipment Asset Management Plan 100,000 100,000 803,856
9
10 2025-15 ITNetwk Res Gen Equipment (Future IT Equipment) 5 100,000 100,000 100,000 Res Gen Equipt
11
12 2025-20 Complex Annual Reserve Contribution (Replacement Capital Complex) 200,000 50,000 150,000 150,000 External OMPF Grant
13 2024-21 Complex Rink Conversion Debt & Reserve Payment 179,682 179,682 329,682 Debt $144,682; Water Reserve $35,000
14
15 2025-30 Rec. Fac. Res Rec. Facilities Lifecycle Annual Contribution per AMP 150,000 50,000 100,000 100,000 Ext OMPF Grant
16 2025-31 Rec. Fac. Asbestos Removal Multiple Facilities 25 125,000 125,000 225,000
17
18 Moore M.Mus Main Furance Building 15 15,000 15,000 15,000
19 Moore M.Mus Basswood Block Roof 25 20,000 20,000 35,000
20
21 2025-50 S.Mus New Roof for the Bury House 25 – – –
22 2025-50 S.Mus Sombra Museum: Reserve for Collection Mgmt. Building 25 5,000 5,000 – – Res Sombra Museum 5000
23
24 2025-51 Parks Vehicle & Equipment Reserve Build Up 125,500 35,500 90,000 90,000 Grant OMPF
25
26 2025-55 Prk Fac River Washrooms 25 80,000 80,000 80,000
27 2025-58 Prk Fac Park Signs Thoughout the Township 25 20,000 20,000 100,000
28 2025-68 Prk Fac Branker Park Breakwall Repair 50 50,000 50,000 150,000
29
30 2014-99 ROADS To Pay Off Bridge 44 Reserve Borrowing (2023) 143,969 143,969 143,969
31 2025-108 ROADS Lambton Line-Pretty Road to Mandaumin 20 1,680,000 1,680,000 1,823,969
32 2025-109 ROADS Lambton Line-Highway 40 to Kimball 20 1,680,000 1,680,000 3,503,969
33
34 2025-150 BRIDGES Bridge Rehabilitation & Maintenance (Reserves) 220,000 220,000 220,000
35 2025-156 BRIDGES Bridge 97 – Rokeby Line over Thorton Drain 100 500,000 500,000 720,000
36 2025-157 BRIDGES Bridge 86-Pretty Road over Annett Drain 100 50,000 50,000 770,000
37
38 2025-200 Storm Road Storm Culvert Replacements 50 120,000 120,000 120,000
39
40 2025-300 Trails RE-asphalt Portion of River Trail 20 120,000 120,000 – – Res. Educ & Envir. 120,000
41
42 Grand Total 6,608,007 235,500 245,000 6,127,507 125,000 120,000
A B C D E F G H I J K L
1 Life Project External Revenue Total Total Initial Educ &
2 ID # Depart. Description Yrs Cost Sources Reserves Fund Revenue By Function Reserves Envir
3
4 2025-01 Fire Radio Reserve 10,000 10,000 10,000
5 2025-02 Fire Life Cycle Budgeting Vehicles (Res Fire Vehicle) 791,800 100,000 691,800 701,800 Grant OMPF
6 2025-03 Fire Asset Management Plan Facilities Life cycle 50,000 50,000 751,800 Res Fire Stn Facilities-Life Cycle
7 2025-04 Fire Operations Vehicles 10 120,000 120,000 – 751,800 Reserve Fire Vehicles 120,000
8 2025-05 Fire Equipment Asset Management Plan 100,000 100,000 851,800
9
10 2025-15 ITNetwk Res Gen Equipment (Future IT Equipment) 5 100,000 100,000 100,000
11
12 2025-20 Complex Annual Reserve Contribution (Replacement Capital Complex) 200,000 50,000 150,000 150,000 External OMPF Grant
13 2024-21 Complex Rink Conversion Debt & Reserve Payment 179,682 179,682 329,682 Debt $144,682; Water Reserve $35,000
14
15 2025-30 Rec. Fac. Res Rec. Facilities Lifecycle Annual Contribution per AMP 150,000 50,000 100,000 100,000 Ext OMPF Grant
16 2025-31 Rec. Fac. Asbestos Removal Multiple Facilities 25 125,000 125,000 225,000 Prior Year Reserves
17
18 Moore M.Mus Blacksmith Shop Repairs 10 10,000 10,000 10,000
19
20 2025-50 S.Mus Sombra Museum: Reserve for Collection Mgmt. Building 25 5,000 5,000 – – Res Sombra Museum 5,000
21
22 2025-51 Parks Vehicle & Equipment Reserve Build Up 125,500 35,500 90,000 90,000 Grant OMPF
23
24 2025-55 Prk Fac River Washrooms 25 80,000 80,000 80,000
25 2025-68 Prk Fac Branker Park Breakwall Repair 50 50,000 50,000 130,000
26
27 2014-99 ROADS To Pay Off Bridge 44 Reserve Borrowing (2023) 143,969 143,969 143,969
28 2025-100 ROADS Rural Surface Treatment 15 575,000 575,000 718,969
29 2025-101 ROADS Urban Asphalt Resurfacing 15 525,000 525,000 1,243,969
30 2025-110 ROADS Brigden Road-Village to Plank Road 15 1,100,000 1,100,000 2,343,969
31 2025-111 ROADS St. Clair Pkwy-Lasalle to Shell Main Entrance 15 1,000,000 1,000,000 3,343,969
32
33 2025-150 BRIDGES Bridge Rehabilitation & Maintenance (Reserves) 220,000 220,000 220,000
34 2025-157 BRIDGES Bridge 86-Pretty Road over Annett Drain 100 500,000 500,000 720,000
35
36 2025-200 Storm Road Storm Culvert Replacements 50 125,000 125,000 125,000
37
38 2025-300 Trails RE-asphalt Portion of River Trail 20 125,000 125,000 – – Res. Educ & Envir. 125,000
39
40 Grand Total 6,410,951 235,500 250,000 5,925,451 125,000 125,000
Township of St. Clair
Projected Reserve on Cash Basis for the Years 2023 to 2026 – Dec. 18, 2023 Council
B CN CO CP CQ CR CS CT CU CV CW CX CY CZ
1 Actuals 2024 2024 Estimated 2025 2025 Estimated 2026 2026 Estimated 2027 2027 Estimated
2 Description of Reserve St. Clair Estimated Estimated St. Clair Estimated Estimated St. Clair Estimated Estimated St. Clair Estimated Estimated St. Clair
3 Dec. 31, 2023 Addition Deletions Dec. 31, 2024 Addition Deletions Dec. 31, 2025 Addition Deletions Dec. 31, 2026 Addition Deletions Dec. 31, 2027
4 Capital Capital
5 General Government
6 Working Capital 643,500 643,500 643,500 643,500 643,500
7 Equipment – General 24,870 67,000 42,000 49,870 32,000 17,870 100,000 117,870 100,000 217,870
8 Election Reserves 14,000 14,000 28,000 14,000 42,000 42,000 42,000
9 Uncollective Taxes 137,559 1,250 138,809 1,250 140,059 140,059 140,059
12 Year End Surplus 524,515 244,576 769,091 769,091 769,091 769,091
13 Property 80,666 80,666 80,666 80,666 80,666
14 Heritage Committee 20,643 20,643 20,643 20,643 20,643
16 Safe restart grant – – – – –
17 Building Permit (84,363) (84,363) (84,363) (84,363) (84,363)
18 Horticulture 720 720 720 720 720
19 1,362,110 326,826 42,000 1,646,936 15,250 32,000 1,630,186 100,000 – 1,730,186 100,000 – 1,830,186
20 Property & Environment
23 St. Clair -Environment and Educa 1,528,399 950,000 1,634,625 843,774 800,000 500,000 1,143,774 800,000 500,000 1,443,774 800,000 500,000 1,743,774
24 1,528,399 950,000 1,634,625 843,774 800,000 500,000 1,143,774 800,000 500,000 1,443,774 800,000 500,000 1,743,774
25 Environment (San. Water & Storm)
26 Waste water 188,541 2,013,923 (1,825,382) 1,724,500 (3,549,882) 800,000 (4,349,882) (4,349,882)
27 Storm Water Replacement 240,194 140,000 100,194 100,194 25,000 75,194 75,194
28 Water Industrial Emergency 343,092 343,092 343,092 343,092 343,092
29 Water Distribut. Syst. 8,646,024 1,047,543 3,651,400 6,042,167 800,000 825,500 6,016,667 800,000 200,000 6,616,667 6,616,667
30 Water Distribut. Syst. (arena) (1,050,000) 35,000 (1,015,000) 35,000 (980,000) 35,000 (945,000) 35,000 (910,000)
31 8,367,851 1,082,543 5,805,323 3,645,071 835,000 2,550,000 1,930,071 835,000 1,025,000 1,740,071 35,000 – 1,775,071
32
33 Roads, Drainage & PW Equipment
34 Equipment – Works- Cash basis 1,675,982 424,000 1,303,000 796,982 500,000 631,000 665,982 500,000 1,165,982 500,000 1,665,982
39 Drains provision 17,910 17,910 17,910 17,910 17,910
40 Capital Drains – Road Portion 985,836 293,645 692,191 496,834 496,834 692,191 1,526,834 1,526,834 692,191 692,191
41 Barnes Drain Self fin Exp2027 (308,749) 74,485 (234,264) 81,834 (152,430) 81,834 (70,596) 80,596 10,000
42 Bridge 2,713,078 2,280,500 432,578 220,000 420,000 232,578 232,578 232,578
43 Bridge 44 Reserve-tag1978 (1,000,000) 143,969 (856,031) 143,969 (712,062) 143,969 (568,093) 143,969 (424,124)
44 Res. parks facilite & Other 323,239 227,849 95,390 95,390 95,390 95,390
45 PW Road Reserve 817,467 214,550 785,600 246,417 246,000 417 417 417
46 PW Building reserves 337,419 50,000 357,693 29,726 50,000 79,726 50000 129,726 129,726
47 Service Delivery Grant Reserve – – – – –
48 Moore Industrial Park 924,285 867,300 56,985 56,985 56,985 56,985
49 Prov for Reserve Uncompleted 15,001 15,001 15,001 15,001 15,001
51 6,501,468 907,004 6,115,587 1,292,885 1,492,637 1,793,834 991,688 2,302,637 1,526,834 1,767,491 724,565 – 2,492,056
52 Community Service
53 Moore Museum Development 50,234 1,000 85,000 (33,766) 1,000 (32,766) 1,000 (31,766) 1,000 (30,766)
56 Sombra Museum 33,895 100 33,000 995 100 1,095 1,095 1,095
57 Somb Mus-Coll mgt Building 5,000 2,000 3,000 5,000 8,000 5,000 13,000 5,000 18,000
58 Brigden Community Hall 5,445 5,445 5,445 5,445 5,445
59 First St. Park Courtright 405 405 405 405 405
60 Energy Audit 24,854 220 25,074 220 25,294 25,294 25,294
62 Bridgen Ball Building Project 23,048 200 23,248 200 23,448 23,448 23,448
63 Moore Campground 60,450 20,000 75,000 5,450 20,000 5,000 20,450 20,000 40,450 40,000 450
64 Parkway Endowment 490,889 13,900 400,000 104,789 13,900 118,689 118,689 118,689
67 Branton Campgrd 134,178 10,000 30,000 114,178 10,000 40,000 84,178 10,000 94,178 10,000 104,178
68 Cathcart Campgd 396,957 40,000 250,000 186,957 10,000 30,000 166,957 10,000 40,000 136,957 10,000 146,957
69 Golf Course-Equipt-Cash 437,877 303,944 560,000 181,821 200,000 332,655 49,166 200,000 92,852 156,314 200,000 42852 313,462
70 Parks Equp & Veh 40,950 132,012 70,000 102,962 125,500 125,000 103,462 125,500 228,962 125,500 354,462
71 Life Cycle for Recr. Facilities 577,968 150,000 748,219 (20,251) 150,000 129,749 150,000 279,749 150,000 429,749
72 Replacement Capital Complex (76,607) 385,622 105,000 204,015 200,000 25,000 379,015 200,000 579,015 200,000 779,015
73 2,200,543 1,061,998 2,358,219 904,322 735,920 557,655 1,082,587 721,500 132,852 1,671,235 701,500 82,852 2,289,883
74 Fire & Emergency
75 Fire Vehicle (496,663) 552,080 2,670,993 (2,615,576) 600,024 1,811,095 (3,826,647) 647,968 1,805,369 (4,984,048) 695,912 1,304,536 (5,592,672)
76 Fire Stn Facilites-Life Cycle 13,515 50,000 63,515 45,000 18,515 50,000 68,515 50,000 118,515
79 Emergency Measures 26,952 26,952 26,952 26,952 26,952
80 Fire Equipment 31,450 100,000 24,110 107,340 45,000 62,340 100,000 162,340 100,000 262,340
81 Radio 10,250 10,000 20,000 250 250 10,000 10,250 10,000 20,250
82 (414,497) 712,080 2,715,103 (2,417,520) 600,024 1,901,095 (3,718,591) 807,968 1,805,369 (4,715,992) 855,912 1,304,536 (5,164,616)
83 Deferred Revenues
84 Parkland Acreage 99,317 15,572 114,889 10,000 124,889 10,000 134,889 10,000 144,889
86 Development Charges 700,474 180,211 698,400 182,285 293,104 208,000 267,389 150,000 417,389 150,000 567,389
87 799,791 195,783 698,400 297,174 303,104 208,000 392,278 160,000 – 552,278 160,000 – 712,278
88
89 GRAND TOTAL 20,345,665 5,236,234 19,369,257 6,212,642 4,781,935 7,542,584 3,451,993 5,727,105 4,990,055 4,189,043 3,376,977 1,887,388 5,678,632
2025 Fire Department Capital Budget
The St. Clair Fire Department’s 2025 Capital Budget underscores a strategic commitment to maintaining and enhancing the Approved Level of Service as determined by the Council. This budget is designed to meet ongoing operational demands through the upkeep and replacement of essential assets, ensuring the department’s readiness to address current and future challenges and reinforcing public safety and firefighter effectiveness.
Capital Project 2024-01: Radio Communications Reserve
This project ensures continuous support for the County Radio System by contributing to a reserve fund dedicated to maintenance, equipment upgrades, and replacements for planned or emergency needs.
Capital Project 2024-02: Vehicle Lifecycle Budgeting
Aligned with the Fire Department’s 25-year Asset Management Plan, this project addresses the funding required for replacing firefighting apparatus. A total of $659,642.00 is needed, with $559,642.00 from municipal resources and $100,000 from OMPF funding, to maintain apparatus reliability and service schedules.
Capital Project 2024-03: Building Infrastructure Maintenance
This project focuses on essential repairs and emergency needs at fire stations, including roof and HVAC system maintenance and parking lot repairs, ensuring operational facilities remain functional and safe for staff and public use.
Capital Project 2024-04: Support Vehicle Procurement
Continuing the program of equipping all stations with support vehicles, this project allocates funding from the Fire Vehicle Reserve to add a new support unit (C4) to the fleet.
Capital Project 2024-05: Equipment Management and Replacement
This project funds the maintenance and replacement of essential firefighting and rescue tools, including SCBAs and vehicle extrication equipment. It adheres to asset management timelines, ensuring equipment remains reliable during emergencies.
Capital Project 2024-06: Station 1 Parking Lot Resurfacing
The resurfacing of Station 1’s parking lot will address uneven surfaces and water pooling caused by deterioration. This project ensures the safe and practical use of the space for training and everyday operations.
Capital Project 2024-07: Virtual Reality Training Simulator
Investing in a state-of-the-art VR Training Simulator marks a significant advancement in firefighter training and safety. This tool allows officers and firefighters to engage in realistic, repeatable training scenarios in a controlled environment. Command staff can practice fire ground leadership and decision- making, while firefighters build skills that prepare them for real-life situations without the complexity of live training logistics. Although it will not replace live-fire exercises, VR training will maximize its effectiveness by equipping personnel with comprehensive pre-training, enhancing situational awareness and operational readiness. This innovative addition underscores the department’s dedication to modern training methods and continuous professional development.
Capital Project 2024-08: Fire Tanker Replacement
Funding the replacement of Tankers 54 and 64, approved at the June 3, 2024, Council meeting, ensures the continued reliability of apparatus at the end of their lifecycle. The Fire Vehicle Reserve will provide the necessary funding for these replacements.
Capital Project 2024-09: Station 4 Floor Repair
This project includes repairs to Station 4’s apparatus floor, which has settled and created hazards and poor drainage. Addressing these issues is essential for maintaining a safe and effective working environment.
Capital Project 2024-10: PPE Storage Solutions
To ensure firefighters’ protective gear is stored correctly, this project funds the installation of proper storage solutions that protect against sunlight and provide adequate ventilation, extending the life of the equipment and improving safety practices.
Capital Project 2024-11: Gear Extractors and Dryers
Investing in additional extractors and dryers for cleaning bunker gear is essential to reducing firefighters’ exposure to carcinogens from combustion by-products. The current long drying times discourage timely cleaning, leaving firefighters without serviceable gear. This project supports quicker gear turnaround, aligning with the department’s cancer prevention strategy. A $60,000 OFM grant has been applied to support this cost.
Capital Project 2024-12: Confined Space Rescue Equipment
This project ensures compliance with the E&R By-law for Technician-Level Confined Space Rescue by acquiring specialized SCBA, air-line carts, and other critical equipment, enabling the safe execution of high-risk rescues.
Capital Project 2024-13: Command Unit Enhancements
Enhancing the command unit with a high-definition live-stream camera and a radio repeater will bolster coordination and situational awareness during incidents. The department has applied for a $50,000 EMO grant to support this initiative.
Capital Project 2024-14: IT Infrastructure Upgrades
This project funds auxiliary equipment for scheduled computer replacements in fire stations, supplementing the primary costs covered by the IT budget.
Capital Project 2024-15: Comprehensive Building Assessment
A building assessment of all six fire stations will identify renovation needs, focusing on changing areas and restrooms. This project will address inadequate facilities for both male and female firefighters, ensure compliance with accessibility standards, and establish clean and dirty zones to minimize carcinogen exposure. This initiative supports the department’s cancer prevention strategies and will be funded through existing reserves, potentially staged based on available funding.
Conclusion
The St. Clair Fire Department’s 2025 Capital Budget reflects a proactive and strategic approach to sustaining operational readiness, prioritizing firefighter safety, and incorporating innovative training solutions. By addressing essential needs and forward-thinking projects, the department ensures that it can continue providing exceptional service to the community while adapting to the evolving landscape of emergency response and firefighter well-being.
Service/Program Radio Communications
Project Name County Fire Radio System Upgrade Work In Progress (WIP) Yes/No Yes Project Description/Need for Work
Planning for future radio replacement or upgrades
Project Priority Indicate High/Medium/LowComments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Life (Years)
Project Budget Expenditures:
Studies Land
Asset Purchase Utilities/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Service/Program Life cycle budgeting – Vehicles
Project Name Fleet
Work In Progress (WIP) Yes/No Yes
Project Description/Need for Work
Reserve funds for planned life cycle fire apparatus replacement – see Fire Lifecycle Calculation Worksheet
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Life (Years)
Project Budget Expenditures:
Studies Land
Asset Purchase Utilities/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Lifecycle Reserve
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib. External contribution
OMPF
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Increased vehicle cost for maintenance due to aging fleet Maintain the approved level of service
Total
Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
3,479,560.00 600,024 647,968 695,912 743,856 791,800
500,000 100,000 100,000 100,000 100,000 100,000
2,958,560 479,024 547,968 595,912 643,856 691,800
21,000
3,479,560 600,024 647,968 695,912 743,856 791,800
Other-Please provide supporting documentation, quotes, operation budget
FIRE DEPARTMENT REPLACEMENT LIFECYCLE COSTS FOR FLEET
Revised Original
Unit Year Vehicle Type Station In-Service Replace Replace Original Cost 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039
Years Date Date
Funded through Special Area Rates (SAR) on Taxes :
12 2016 Ladder Tower Brigden 15 years 2031 2041 $1,753,493 $2,300,000
22 2016 Ladder Tower Brigden 20 years 2036 2041 $1,753,493 $2,300,000
Funded through Life Cycle Reserves (Asset Management) :
C2 2019 Pickup Truck Admin 4 years 2023 $ 75,000 $90,000 $90,000 $90,000
21 2003 Fire Pumper Corunna 15 years 2023 2023 $350,000 $900,000
14 2004 Tanker Brigden 20 years 2024 2029 $210,000
45 1999 Rescue Wilkesport 25Years 2024 2024 $110,000
61 2009 Fire Pumper Becher 15 years 2024 2029 $235,000 $900,000
C3 2021 Pickup Truck # 3 Admin 4 years 2025 $ 75,000 $115,385 $90,000 $90,000 $90,000
54 2005 Tanker Pt Lambton 20 years 2025 2030 $210,000 $759,615
64 2005 Tanker Becher 20 years 2025 2030 $210,000 $759,615
C4 2019 Pickup Truck # 4 Admin 5 years 2026 $ 75,000 $ 115,385 $115,385 $115,385 $115,385
11 2008 Fire Pumper Brigden 15 years 2026 2028 $275,000 $1,420,000
C1 2023 Pickup Truck Admin 4 years 2027 $ 75,000 $ 115,385 $115,385 $ 115,385 $115,385
41 2012 Fire Pumper Wilkesport 15 years 2027 2031 $185,000 $900,000 $900,000
55 2006 Rescue Pt Lambton 25Years 2030 2030 $90,000 $90,000
35 2008 Rescue Courtright 25 years 2031 2031 $110,000 $90,000
63 2016 One Tonne F350 Becher 15 years 2031 2031 $57,397
25 2007 Rescue Corunna 25 years 2032 2032 $170,000 $90,000
15 2009 Rescue Brigden 25 years 2034 2034 $180,000 $90,000
31 2020 Fire Pumper Courtright 15 years 2035 2021 $485,049
44 2015 Tanker Wilkesport 20 years 2035 2014 $95,000 $700,000
51 2020 Fire Pumper Pt Lambton 15 years 2035 2019 $485,049
65 2012 Rescue Becher 25Years 2037 2037 $40,000 $100,000
17 2019 Tanker Brigden 20 years 2039 2019 $356,049 $850,000
34 2019 Tanker Courtright 20 years 2039 2013 $424,231 $900,000
36 2016 Command Unit Courtright 25 years 2041 2041 $397,688
67 2013 Air Trailer Becher 30 years 2043 2027 $117,000
Funded through Life Cycle Reserves (Asset Management) :
S13 Pickup Truck # 5 Brigden 10 years All staion pickup trucks are recycled chiefs vehicles and will be replaced after six more years of service.
S23 Pickup Truck # 6 Corunna 10 years All staion pickup trucks are recycled chiefs vehicles and will be replaced after six more years of service.
S33 Pickup Truck # 7 Courtright 10 years All staion pickup trucks are recycled chiefs vehicles and will be replaced after six more years of service.
S43 Pickup Truck # 8 Wilkesport 10 years All staion pickup trucks are recycled chiefs vehicles and will be replaced after six more years of service.
S53 Pickup Truck # 9 Pt Lambton 10 years All staion pickup trucks are recycled chiefs vehicles and will be replaced after six more years of service.
S63 Pickup Truck # 10 Becher 10 years All staion pickup trucks are recycled chiefs vehicles and will be replaced after six more years of service.
Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Actual Replacement Cost $11,641,925 $1,634,615 $1,535,385 $1,015,385 $990,000 $90,000 $205,385 $115,385 $180,000 $180,000 $205,385 $1,715,385 $990,000 $190,000 $115,385 $1,865,385
Inflation Adjustment 4.0% $65,385 $125,287 $126,785 $168,160 $19,499 $54,493 $36,454 $66,342 $76,196 $98,635 $925,371 $595,022 $126,364 $84,424 $1,494,068
Cost to Purchase Equipment $1,700,000 $1,660,672 $1,142,170 $1,158,160 $109,499 $259,878 $151,839 $246,342 $256,196 $304,020 $2,640,756 $1,585,022 $316,364 $199,809 $3,359,453
Life Cycle Reserve Schedule:
Opening Life Cycle Reserve Balance ($2,615,576) ($3,826,647) ($4,984,048) ($5,592,672) ($6,186,584) ($5,668,861) ($5,241,156) ($4,640,015) ($4,068,852) ($3,441,382) ($2,795,027) ($4,486,574) ($5,092,019) ($4,359,598) ($3,435,862)
Cost to Purchase Equipment From Above ($1,700,000) ($1,660,672) ($1,142,170) ($1,158,160) ($109,499) ($259,878) ($151,839) ($246,342) ($256,196) ($304,020) ($2,640,756) ($1,585,022) ($316,364) ($199,809) ($3,359,453)
Yearly Budgeted Expense for Capital Budget $600,024 $647,968 $695,912 $743,856 $791,800 $839,744 $887,688 $935,632 $983,576 $1,031,520 $1,079,464 $1,127,408 $1,175,352 $1,223,296 $1,271,240
Reserve Balance Interest** 2.99% ($111,095) ($144,697) ($162,366) ($179,609) ($164,578) ($152,161) ($134,709) ($118,127) ($99,910) ($81,145) ($130,254) ($147,831) ($126,568) ($99,750) ($165,170)
Closing Life Cycle Reserve Balance ($3,826,647) ($4,984,048) ($5,592,672) ($6,186,584) ($5,668,861) ($5,241,156) ($4,640,015) ($4,068,852) ($3,441,382) ($2,795,027) ($4,486,574) ($5,092,019) ($4,359,598) ($3,435,862) ($5,689,245)
Yearly Increase in Reserve Contribution to Break Even $47,944
Ending Balance in Reserve $234
Notes
**Using 30 year average of bank rates from Statistics Canada
FIRE DEPARTMENT REPLACEMENT LIFECYCLE COSTS FOR FLEET
Revised
Unit Year Vehicle Type Station In-Service Replace 2040 2041 2042 2043 2044 2045 2046 2047 2048 2049
Years Date
Funded through Special Area Rates (SAR) on Taxes :
12
22 2016
2016 Ladder Tower
Ladder Tower Brigden
Brigden 15 years 2031
20 years 2036
Funded through Life Cycle Reserves (Asset Management) :
C2 2019 Pickup Truck Admin 4 years 2023 $90,000 $90,000 $90,000
21 2003 Fire Pumper Corunna 15 years 2023
14 2004 Tanker Brigden 20 years 2024
45 1999 Rescue Wilkesport 25Years 2024 $350,000
61 2009 Fire Pumper Becher 15 years 2024
C3 2021 Pickup Truck # 3 Admin 4 years 2025 $90,000 $90,000 $90,000
54
64 2005
2005 Tanker
Tanker Pt Lambton
Becher 20 years
20 years 2025
2025 $700,000
C4 2019 Pickup Truck # 4 Admin 5 years 2026 $115,385 $115,385
11 2008 Fire Pumper Brigden 15 years 2026 $900,000
C1 2023 Pickup Truck Admin 4 years 2027 $115,385 $115,385
41 2012 Fire Pumper Wilkesport 15 years 2027
55
35 2006
2008 Rescue
Rescue Pt Lambton
Courtright 25Years 2030
25 years 2031
63 2016 One Tonne F350 Becher 15 years 2031
25
15 2007 Rescue Corunna 25 years 2032
2009 Rescue Brigden 25 years 2034
31 2020 Fire Pumper Courtright 15 years 2035
44 2015 Tanker Wilkesport 20 years 2035
51 2020 Fire Pumper Pt Lambton 15 years 2035 $900,000
65 2012 Rescue Becher 25Years 2037
17
34 2019
2019 Tanker
Tanker Brigden
Courtright 20 years
20 years 2039
2039
36
67 2016
2013 Command Unit
Air Trailer Courtright
Becher 25 years
30 years 2041
2043
$117,000
Funded through Life Cycle Reserves (Asset Management) :
S13 Pickup Truck # 5 Brigden 10 years All staion
S23 Pickup Truck # 6 Corunna 10 years All staion
S33 Pickup Truck # 7 Courtright 10 years All staion
S43 Pickup Truck # 8 Wilkesport 10 years All staion
S53 Pickup Truck # 9 Pt Lambton 10 years All staion
S63 Pickup Truck # 10 Becher 10 years All staion
Year 16 17 18 19 20 21 22 23 24 25
Actual Replacement Cost $90,000 $990,000 $1,015,385 $232,385 $90,000 $790,000 $115,385 $115,385 $90,000 $440,000
Inflation Adjustment $78,568 $938,421 $1,041,599 $257,215 $107,201 $1,010,227 $158,068 $169,006 $140,697 $732,968
Cost to Purchase Equipment $168,568 $1,928,421 $2,056,984 $489,600 $197,201 $1,800,227 $273,453 $284,391 $230,697 $1,172,968
Life Cycle Reserve Schedule:
Opening Life Cycle Reserve Balance ($5,689,245) ($4,674,334) ($5,392,173) ($6,214,503) ($5,397,796) ($4,206,150) ($4,580,452) ($3,344,144) ($2,032,758) ($577,485)
Cost to Purchase Equipment From Above ($168,568) ($1,928,421) ($2,056,984) ($489,600) ($197,201) ($1,800,227) ($273,453) ($284,391) ($230,697) ($1,172,968)
Yearly Budgeted Expense for Capital Budget $1,319,184 $1,367,128 $1,415,072 $1,463,016 $1,510,960 $1,558,904 $1,606,848 $1,654,792 $1,702,736 $1,750,680
Reserve Balance Interest** ($135,705) ($156,545) ($180,419) ($156,709) ($122,113) ($132,979) ($97,087) ($59,015) ($16,766) $7
Closing Life Cycle Reserve Balance ($4,674,334) ($5,392,173) ($6,214,503) ($5,397,796) ($4,206,150) ($4,580,452) ($3,344,144) ($2,032,758) ($577,485) $234
Yearly Increase in Reserve Contribution to Break Even
Ending Balance in Reserve
Notes
**Using 30 year average of bank rates from Statistics Canada
19
Department Emergency Services
Service/Program Maintaining Building Infrastructure
Project Name Asset Management Plan Work In Progress (WIP) Yes/No No Project Description/Need for Work
An ongoing reserve to take care of larger maintenance items at the stations for example, cement pad
replacement, paving, fencing light upgrades and energy efficiency projects, change rooms, roof repairs.
Aligns with Township Assets Management Plan
Project Priority Indicate High/Medium/ Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Life (Years)
Project Budget Expenditures:
Studies Land
Asset Purchase Utilities/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib. External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Occupational Disease (Cancer prevention program) Maintenance of building infrastructure
Total
Expenditures Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
250,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00
250,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00
250,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00
250,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00
Other-Please provide supporting documentation, quotes, operation budget
Project Name Operations vehicles Work In Progress (WIP) Yes/No Yes Project Description/Need for Work
These trucks are the start of a fleet rationalization plan to allow vehicles for station use to carry the below mentioned equipment and personnel
A pickup truck to the fleet to carry rescue items, such as extrication tools,
medical supplies, high-angle rescue equipment, Haz-Mat equipment and spill control items.
Cost includes, vehicle, emergency lighting and siren, box cap and roll out tray and shelving.
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Life (Years)
Project Budget Expenditures:
Studies Land
Asset Purchase Utilities/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Project Name
Work In Progress (WIP) Yes/No Yes
Project Description/Need for Work
An equipment asset management plan for scheduled replacement of equipment Examples, SCBA, Extrication tools, training props,
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Life (Years)
Project Budget Expenditures:
Studies Land
Asset Purchase Utilities/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Department Emergency Services Service/Program Maintaining Building Infrastructure Project Name Brigden Fire Station parking lot
Project Description/Need for Work
Replace aging and damaged parking lot at the Brigden Fire Station, Heavy vehicle traffic has caused the asphalt to deteriorate and become uneven This condition of the asphalt could lead to slip and trip issues due to
uneven surfaces and potential standing water/ice
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Life (Years)
Uneven surface causing slip and trip hazard, also allows for standing water and ice buildup
Parking lot is aging and deteriorating due increased use
Project Budget Expenditures:
Studies Land
Asset Purchase Utilities/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Department Emergency Services
Service/Program Training
Project Name Virtual Reality Training Simulator
Project Description/Need for Work
The Fire Department proposes the purchase of the “inCommand”, Incident Command and Control Training Simulator (virtual reality) for the purpose of advancing the training program of the station officers and firefighters. This equipment will fill in a significant gap in the training program and development of station officers, improving on-site supervision of firefighters and
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years)
Project Budget Expenditures:
Studies Land
Asset Purchase Utilities/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates)
Reserves/Reserve Funds General reserves Equipment reserves
DC reserves
Other -St. Clair Educ. & Envir.
Long Term Financing
Debenture Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Department Emergency Services
Service/Program Fleet
Project Name Fire Tanker
Project Description/Need for Work
Scheduled replacement of Station 5, tanker 54 and Station 6, tanker 64.
Previously approved at the June 3, 2024 Council Meeting
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years)
Project Budget Expenditures:
Studies Land
Asset Purchase Utilities/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Department Emergency Services Service/Program Maintaining Building Infrastructure Project Name Station 4 Apparatus floor repair
Project Description/Need for Work
Replace existing damaged concrete and floor drains on apparatus floor
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Life (Years)
Total
Project Budget
Expenditures:
Studies Land
Asset Purchase Utilities/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Department Emergency Services Service/Program Fire Station Project Name Station 2 upgrades
Project Description/Need for Work
Remove existing gear racks to install racking that allows proper storage and protection of fire gear. Allows gear to hang properly and prevent damage due to improper storage. Stations 5 and 6 completed in 2024.
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Life (Years)
Project Budget Expenditures:
Studies Land
Asset Purchase Utilities/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates)
Reserves/Reserve Funds General reserves Equipment reserves
DC reserves
Other -St. Clair Educ. & Envir.
Long Term Financing
Debenture Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Department Emergency Services Service/Program Fire Station Project Name Gear extractor and dryers
Project Description/Need for Work
Install bunker gear extractors and dryers in Station 3, 4, & 6. This will ensure all stations have a access to clean bunker gear Stations 1, 2, & 6 have already been completed.
An OFM grant of $60,000.00 has been applied for.
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years)
Project Budget Expenditures:
Studies Land
Asset Purchase Utilities/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib. External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
ram.
Department Emergency Services
Service/Program
Project Name Confined Space Equipment
Project Description/Need for Work
Asset purchase to align our Task Force 2 team with confined space requirements
as set out in the St. Clair Township Establishing and Regulating By-Law
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years)
Project Budget Expenditures:
Studies Land
Asset Purchase Utilities/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Department Emergency Services Service/Program Project Name Command Unit upgrade
Project Description/Need for Work
Install upgraded Command Post camera and add an additional radio repeater to ensure radio communications are uninterrupted.
Emergency Measures Ontario grant has been applied for.
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years)
Project Budget Expenditures:
Studies Land
Asset Purchase Utilities/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Department Emergency Services / IT
Service/Program Fire Stations
Project Name
Fire Station IT infrastructure upgrades
Project Description/Need for Work
Update all 6 stations IT infrastructure.
Software licensing renewal.
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years)
Project Budget Expenditures:
Studies Land
Asset Purchase Utilities/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Department Emergency Services
Service/Program Fire Stations
Project Name
Fire Station Condition Assessment
Project Description/Need for Work
Conduct a comprehensive station assessment for future needs
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years)
Project Budget Expenditures:
Studies Land
Asset Purchase Utilities/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Project Name Cabinets
Work In Progress (WIP) Yes/No Previous project #
Project Description / Need for Work
Reorganize server & wiring cabinets (contractor)
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving / Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 15 years
Computer network & security
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilities/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Res General Equipment
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Project Name Conference Rooms / Council Chambers
Work In Progress (WIP) Yes/No Previous project #
Project Description / Need for Work
Two Conference Rooms & Council Chambers Upgrades
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving / Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 15 years
Computer network & security
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilities/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Res General Equipment
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Project Name Cabinet Locks
Work In Progress (WIP) Yes/No Previous project #
Project Description / Need for Work
IT Cabinet Locks Throughout Township (12 x $4,000)
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving / Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 15 years
Computer network & security
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilities/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Res General Equipment
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Project Name Networking
Work In Progress (WIP) Yes/No Previous project #
Project Description / Need for Work
General Township Networking Upgrades / Replacements
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving / Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 10 years
Computer network & security
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilities/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Res General Equipment
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Project Name Access Control System
Work In Progress (WIP) Yes/No Previous project #
Project Description / Need for Work
General Twp Access Control System Phase 1
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving / Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 15 years
Computer network & security
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilities/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Res General Equipment
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Project Name TOMRMS
Work In Progress (WIP) Yes/No Previous project #
Project Description / Need for Work
TOMRMS – Record Retention & Management Program
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving / Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 15 years
Computer network & security
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilities/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Res General Equipment
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Capital Budget Overview: Facilities Management in St. Clair Township
Project Title: Aging Facilities Assessment and Management
Overview: St. Clair Township is facing significant challenges related to the management and maintenance of aging municipal facilities. Recent government programs and inspections have highlighted critical issues, including asbestos presence, inadequate asset management practices, accessibility compliance, and rising operational costs. With limited reserves and an already busy department, it has become increasingly clear that the current facilities have exceeded our capacity to manage effectively.
Key Issues Identified:
1. Aging Facilities: Many municipal buildings are in disrepair, posing safety hazards and accessibility challenges for residents.
2. Asbestos Concerns: The presence of asbestos in older structures necessitates urgent assessment and remediation to ensure public safety.
3. Accessibility Compliance: Facilities are not fully compliant with current accessibility standards, limiting access for individuals with disabilities.
4. Rising Operational Costs: Increased utility costs, maintenance expenses, and staffing challenges are straining the municipality’s budget.
5. Limited Reserves: Existing financial reserves are insufficient to cover the comprehensive needs of facility repairs and upgrades.
Proposed Solution:
To address these challenges, the municipality will request the establishment of a new position during capital budget season: Coordinator of Facilities. This role will focus on:
• Comprehensive Facility Assessments: Conducting regular assessments to identify critical repairs, prioritize needs, and manage facility upgrades.
• Asset Management: Implementing effective asset management strategies to extend the lifespan of facilities and optimize operational efficiency.
• Regulatory Compliance: Ensuring all facilities meet safety, health, and accessibility standards, including managing asbestos remediation and accessibility upgrades.
• Operational Efficiency: Streamlining processes and improving resource allocation to reduce operational costs and maximize the use of limited funds.
Budget Implications:
• Personnel Costs: Funding for the Coordinator of Facilities position, including salary and benefits.
• Assessment and Remediation: Initial funding for facility assessments, asbestos removal, and accessibility upgrades.
• Training and Development: Resources for training staff on best practices in facilities management and compliance.
Financial Considerations:
• Initial Investment: The request for the new coordinator position will require initial funding, but the long-term benefits include reduced operational costs and improved facility management.
• Potential Grants: Explore government grants and funding programs aimed at infrastructure improvement, accessibility enhancements, and environmental safety, which can help offset costs.
• Community Engagement: Actively involve community members in discussions about facilities usage and needs to ensure investments align with public priorities.
Conclusion:
The aging facilities of St. Clair Township represent a significant challenge that requires immediate attention and strategic planning. By establishing a Coordinator of Facilities, we aim to create a proactive approach to facility management that addresses safety, compliance, and operational efficiency. This position will be crucial in ensuring our facilities serve the community effectively and sustainably in the years to come. A thorough assessment of funding sources and potential partnerships will be essential to support this initiative.
Project Name Annual Reserve Contribution
Work In Progress (WIP) Yes/No Previous project #
Project Description/Need for Work
Contribution to reserves for on going up keep of Complex
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years)
Maintain a safe facility
Keep facility up to date User Satisfaction
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Project Name Annual Debt and Reserve Payment (Arena Retrofit)
Work In Progress (WIP) Yes/No Previous project # n/a
Project Description/Need for Work
Annual Debt and Reserve Payment (Arena Retrofit)
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years)
Keep facility up to date
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2024 2025 2026 2027 2028
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Debt
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Project Name Parking Lot
Work In Progress (WIP) 2024 Project increase budget by $32,500
Project Description/Need for Work
We were having problems with our drains in the parking lot, so we had them xvac’d and camera’d.
During this we discovered that we need to replace the existing drainiage system due to failure in multiple spots
Public Woorks/Drainage is helping us with this project and it is now suggested we add 32,500 to last years for a $100,000 project This work needs to happen before or at least when we pave the parking lot – Increase to Project 2024-27
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement
Growth Related Needs
Service Enhancement
Other
Useful Live (Years)
25
Project Budget Total Expenditures/
Year 1
Year 2
Year 3
Year 4
Year 5
Expenditures: Financing 2025 2026 2027 2028 2029
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Project Name HRV’s 6
Work In Progress (WIP) 2024 Project need to increase budget by $25,000
Project Description/Need for Work
HRV’s throughout the Complex are all exceeding the end of their intented life cycles and need to replaced Approved in 2024, need an extra $25,000 To finish the project
2024 Project 2024-30
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 10
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2025 2025 2025 2025
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Project Name Lunch Room Completion
Work In Progress (WIP) New project for 2025
Project Description/Need for Work
With the Arena Compressor project over, there is now room again to move the staff lunch room back to the old compressor room
The Community Services team has already started with the preperation of this room, but there are some substantial costs with
the renovation of this space including, plumbing, electrical, counters, lockers, kitchenette equipment.
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 25
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Project Name Pool Refurbishment
Work In Progress (WIP) New this year
Project Description/Need for Work
With the Community Sport and Recreation Infrastructure Fund, council decided to have staff apply for funding to refurbish the pool HVAC system, pool/deck surfacing, diving board, 3 outstanding roofs of the complex and outside façade restoration
Community Sport Fund
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Project Name New Fitness Equipment
Work In Progress (WIP) New for this year
Project Description/Need for Work
The purchase of new cardio equipment to replace the existing equipment. The existing equipment is 20+ years old and has been in need of a replacement. The replacements will be done with Commercial grade cardio equipment. We also plan to upgrade some of the smaller equipment to build a more desirable fitness centre.
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 10
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Project Description/Need for Work
The paving at the back of the Rinks at the Moore sports Complex was need of repair before our project,
The plan would be to pave from the flags room back to our yards for the parks equipment over to the new compressor room and the back of both rinks.
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Work In Progress (WIP) Yes/No Previous project # Last year not approved
Project Description/Need for Work
Councillor Langis has proposed a motion to renovate Boardroom #2 using funds from the Education and Environment Budget. This project aims to create a more functional, comfortable, and aesthetically pleasing meeting space that reflects the values of
our organization. Paint, cabinetry, Chairs, Carpet, blinds, storage will make up this project
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Work In Progress (WIP)
Project Description/Need for Work
Shower wall is starting to buckle in the womens change room. Men’s floor has a temporay fix. It is time for a complete overhaul of this space
With the approval of the Funding for the New project this would change this space to storage rooms
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Project Name Keyless Entry
Work In Progress (WIP)
Project Description/Need for Work
This project aims to install a keyless entry system at the Sports Complex to enhance security, streamline access for staff and users, and improve overall facility management. The current lock-and- key system has proven inefficient, leading to lost keys, unauthorized access, and difficulties in tracking entry and exit.
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Department Community Service
Service/Program Recreation Facilities
Project Name Facilities Lifecycle Annual Contribution
Work In Progress (WIP) Yes/No Previous project #
Project Description/Need for Work
Contribution to reserves for on going up keep of Recreation Facilities (Community Halls, Libraries, Rapids Health Emergency Services Building, Sombra Daycare, Civic Centre,
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years)
Maintain a safe facilities
Keep facilities up to date User Satisfaction
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Project Name Asbestos Removal Multiple Facilities
Work In Progress (WIP)
Project Description/Need for Work
Please see attached documentation, for a more indepth look at the project. This project aims to safely remove asbestos from various aging municipal facilities to ensure the health and safety of occupants and comply with current regulatory standards. Many of these
buildings, constructed before the 1980s, contain asbestos in insulation, flooring, and ceiling materials, posing significant health risks if disturbed.
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 25
We will look at remove higher risk substances in 2025
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Project Name Wilkesport Library Roof
Work In Progress (WIP) no
Project Description/Need for Work
Wilkesport Library Roof is at the end of life, the asphalt shingles are failing, we need toreplace the roof to protect the rest of the building.
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 20
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Project Name Civic Center HVAC Controls
Work In Progress (WIP) no
Project Description/Need for Work
Design Costs in 2025, project in 2026
Upgrade to a modern, programmable HVAC control system with smart technology for real-time monitoring and automated adjustments. Improve overall energy efficiency by at least 20%, contributing to municipal sustainability goals.
Enhance comfort levels for staff and visitors by providing consistent climate control throughout the facility. Reduce operational costs and maintenance needs through reliable technology. Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 20
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Project Name Corunna Library Window Replacement
Work In Progress (WIP) Yes
Project Description/Need for Work
Windows have been replaced throughout the facility except for the front side windows and doors that face the east Making the front door more accesible.
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement
Windows and doors past their life expectancy
Growth Related Needs
Service Enhancement
Other
Useful Live (Years)
25
Project Budget Total Expenditures/
Year 1
Year 2
Year 3
Year 4
Year 5
Expenditures: Financing 2025 2026 2027 2028 2029
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Project Name Corunna Library – Façade Restoration
Work In Progress (WIP) Yes/No Previous project #
Project Description/Need for Work
Façade Restoration including repairs to the masonry and sealant work followed by coating of the masonry exterior. This work would also include sanding and painting of the soffits of the facility.
This project has increased by $10,000, as the team assessed the damage is getting worse from putting off this project
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 20
Needs to be weather tight. To protect the facility
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Project Name IT Remodel Expansion at Emergency Services
Work In Progress (WIP) no
Project Description/Need for Work
This project focuses on expanding and refurbishing the IT department space to accommodate the growing technological needs of the municipality. The current facilities are inadequate, leading to congestion and limiting the department’s ability to operate efficiently and effectively. The expansion will provide additional workstations, meeting areas, and upgraded technology infrastructure.
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 20
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2024 2025 2026 2027 2028
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Project Name Shell Health Centre Paving
Work In Progress (WIP) No
Project Description/Need for Work
Paving around the facility of the Rapids Health Centre
There are concerns about cleaning up the curb appeal of this building, this will help.
Parking has been an issue for years at the Parkdale Park. There is very limited parking at the park, so users are forced to park on the street.
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 50
Pot Holes and tripping hazards
Total
Project Budget F16 Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Project Name Civic Centre Front Sign
Work In Progress (WIP) No
Project Description/Need for Work
Sign at the Civic Centre is past its useful life, the electrical has coroded enough that the lights do not work anymore The bricks have begun to deteriorate as well
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement
Still there but appearance is lacking
Growth Related Needs
Service Enhancement
Other
Useful Live (Years)
20
Project Budget Total Expenditures/
Year 1
Year 2
Year 3
Year 4
Year 5
Expenditures: Financing 2025 2026 2027 2028 2029
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Project Name Port Lambton Hall Entrance and Sidewalk repairs
Work In Progress (WIP) No
Project Description/Need for Work
sidewalk entrance repairs happen, making this hall more accessible.
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 25
accessibility
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2024 2025 2026 2027 2028
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Project Name Emergency Services Front Façade & eves
Work In Progress (WIP)
Project Description/Need for Work
This project aims to repair and restore the front facade of the Emergency Services Building, which has suffered wear and damage due to environmental exposure and age. Ensuring the integrity and appearance of this critical facility is essential for operational efficiency and community trust.
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 25
to the point they could fall off the building
Building purchased in 2009 no date on when the façade was last done
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2024 2025 2026 2027 2028
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Project Name Emergency Services Roof Top Access
Work In Progress (WIP) Not approved Last year
Project Description/Need for Work
Roof top access for this building has been an issue for a while now, the opening is not sufficent for staff to access the roof with their proper gear for working at heights. The access is need to service HVAC units that are up there on
the small flat roof that is also in need of replacement. It is our advisment that we should remove the abandoned HVAC units that are on the roof, remove the units we do use and replace the roof in this area and close the access as it will not be needed anymore. This will be more cost effective than opening the roof access and replacing the roof
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 40
Roof Access Roof replacement
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Project Name Corunna Library – Paving Parking Lot
Work In Progress (WIP) Yes/No Previous project #
Project Description/Need for Work
Lambton County Library has done a safety audit on the building and have raised the concern over the gravel parking
and drive way that are at this facility. They are concerned about the water that pools at the back and could turn into
ice, or the snow that is piled back there could be melt and turn into ice. This is where their staff park. There is no drain for the back of this building a lot of the cost comes from adding a Catchbasin and storm pipe
Increased this project by 7,000 as it was orginally quoted in 2022
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 25
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Project Name Shell Health Centre Front Vestibule Entrance
Work In Progress (WIP) No
Project Description/Need for Work
It was looked at a couple years ago to add sliding doors to the front entrance of the Rapids Health Centre, as the
doors that are there now are not compliant for accessibility purposes. The space between the 2 doors is too narrow
and does not meet regulations. The solution to this is to expand towards the street and close in the over hang that is currently on the building. This will allow enough room for a vestibule and a heat barrier for the small foyer that is
there If this project was chosen to move up it should be requoted, as the current one is out of date.
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 25
Accessiblity
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Project Name Civic Centre Mens/Lower Washrooms
Work In Progress (WIP) No
Project Description/Need for Work
Civic Centre washrooms project started in 2022 with the refurbishment of the Ladies washroom on the main level
Doors will need to be moved to make accessible along with new hardware Lower washrooms would receive a facelift, with no accessiblility features added
If this project is chosen to move up it should be requoted as the the quote is 3 years old
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 25
Accessiblitiy
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
The carpet does have some stains on it and one noticelble fraying line, we do not feel this is past its life expectancy
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
The carpet does have some stains on it and one noticelble fraying line, we do not feel this is past its life expectancy
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Project Name All Facilities Gutter Guards
Work In Progress (WIP) no
Project Description/Need for Work
Want to start placing gutter guards on all of our facilties
Make this a reoccuring capital item till all the buildings are complete
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 20
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Department Community Services
Service/Program Moore Museum
Project Name Pavillion
Work In Progress (WIP) Yes/No Previous project #
Project Description/Need for Work
Total
Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
–
–
–
–
–
–
–
–
30,000.00
–
30,000.00 30,000.00 – – – –
Financing:
External Sources
Grants/Subsidies –
Direct Development Contrib. –
External contribution –
Others (Fundraising) 5,000.00
Revenue Fund
From Operations (tax base) 25,000.00
From Operations (User rates) –
Reserves/Reserve Funds
General reserves –
Equipment reserves –
DC reserves –
Other -Museum Reserve
Long Term Financing
Debenture –
Lease –
Total Financing – 30,000.00 – – – –
Other-Please provide supporting documentation, quotes, operation budget
Quote attached.
Department Community Services
Service/Program Moore Museum
Project Name Shaw Exhibition Building Roof
Work In Progress (WIP) Yes/No Previous project #
Project Description/Need for Work
The Francis E. Shaw Exhibition Building was an early addition to Moore Museum. The largest building on site, it allows for the storage and display of larger agricultural equipment that require a lot of space. The roof of the building was replaced in 1999, and while it still in good shape, the life of the roof can be prolonged through regular maintenance. The museum was approached by a potential donor, interested in the Shaw Exhibition Building. If funds are recieved from this donor, we plan to use them towar ds the maintenance of the roof. Maintenance plans will depend on the amount of funds received.
Project Priority MM#2 Indicate High/Medium/Low Comments
The Shaw Building houses a large amount of the museums collection, including artifacts too large to be housed in any other area. This building highlights the agricultural history of the former Moore Township, an intergal part of our community story. While the roof is not in urgent need of repair, regular maintenance will prolong the life of the roof and help prevent costly issues and repairs in the future.
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement
Other
Medium
Useful Live (Years)
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies –
Land –
Asset Purchase –
Utilties/Design –
Furnishing/Equipment –
Sitework/Landscaping –
Contingency –
Interim Financing Cost –
Other
–
Total Expenditures – – – – – –
Financing:
External Sources
Grants/Subsidies –
Direct Development Contrib. –
External contribution –
Others (Fundraising)
Revenue Fund
From Operations (tax base)
From Operations (User rates) –
Reserves/Reserve Funds
General reserves –
Equipment reserves –
DC reserves –
Other -Museum Reserve
Long Term Financing
Debenture –
Lease –
Total Financing – – – – – –
Department Community Services
Service/Program Moore Museum
Project Name Schoolhouse Roof
Work In Progress (WIP) Yes/No Previous project #
Project Description/Need for Work
The cedar roof at the one-room on the roof will promote rotting to ensure that moss cannot grow housed within.
Project Priority MM#3
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) schoolhouse on the Museum grounds needs replacing. The excessive amount of moss of the shingles. Installation of a new roof, with the addition of zinc or copper stripping on the new shingles, will ensure the preservation of this building and the artifacts
Indicate High/Medium/Low Comments
The one-room schoolhouse is an authentic part of the immersive experience that students and other visitors feel at Moore Museum. It is used regularly for
High programming, activities and events, and is visited by
thousands of patrons each year. Maintaining our heritage buildings is an important part of the Museum’s mandate and ensures that we can continue to offer these services
to the community.
Total
Financing:
External Sources
Grants/Subsidies –
Direct Development Contrib. –
External contribution –
Others (Fundraising)
Revenue Fund
From Operations (tax base) 40,000.00 40,000.00
From Operations (User rates) –
Reserves/Reserve Funds
General reserves –
Equipment reserves –
DC reserves –
Other -Museum Reserve
Long Term Financing
Debenture –
Lease –
Total Financing 40,000.00 – 40,000.00 – – –
Department Community Services
Service/Program Moore Museum
Project Name Chapel Roof
Work In Progress (WIP) Yes/No Previous project #
Project Description/Need for Work
The century year old Trinity St. Clair Landing, tied to some of the earliest arbour, graciously donated by the M by our wonderful volunteers. Its beau ceremonies.
Project Priority MM#4
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) Chapel was moved to the Museum in 1998. Its history leads back to the chapel at Sutherland’s European settlers in the Township. Most recently, the landscaping was updated with a new oore Community Recreational Foundation and installed, surrounded with new paving stones ty is appreciated by visitors and groups who are able to rent the venue for wedding
Indicate High/Medium/Low Comments
Trinity St. Clair Chapel is in need of a new roof, for the protection of both the historic building and the artifacts it holds. It is an authentic part of the immersive experience
Medium that students and other visitors feel at Moore Museum.
Maintaining our heritage buildings is an important part of the Museum’s mandate and ensures that we can continue to offer services to the community.
Financing:
External Sources
Grants/Subsidies –
Direct Development Contrib. –
External contribution –
Others (Fundraising)
Revenue Fund
From Operations (tax base) 25,000.00
From Operations (User rates) –
Reserves/Reserve Funds
General reserves –
Equipment reserves –
DC reserves –
Other -Museum Reserve
Long Term Financing
Debenture –
Lease –
Total Financing – – – 25,000.00 – –
Moore Museum 5 Year Capital Plan
Project
Pavillion
Shaw Roof
Schoolhouse Roof
Chapel Roof
Main Building Furnace
Basswood Block Roof
Blacksmith Shop Repairs
CAPITAL PROJECT 2025‐50
PRESENT: David Lee (Chairperson), John DeMars, Darrell Randell, Shelley Lucier, Barb Kerwin, Kailyn Shepley (Curator), Fiona Doherty (Moore Museum), Cathy Langis (Councillor), Joyce SImpson
ABSENT WITH REGRETS: Glenda Young, John Belanger
Sombra Museum’s Capital Budget Proposal for 2024‐2029:
2024: $5000 for conservation‐restoration work to the Abraham Smith log cabin (requesting to be moved to reserve for future projects)
2024: money for preliminary design for a new collection management building 2024: $5000 reserve against new collection management building.
2025: Painting of the full exterior of the Bury House
2025: $5000 reserve against new collection management building.
2026: New HVAC system for the Bury House, including ductless air conditioner and heat for the upstairs, and a full home dehumidification system.
2026: $5000 reserve against new collection management building.
2027: Interior painting of the Bury House and wallpaper of the Bury House kitchen, using a reproduced pattern authentic to the 1880s‐1920 era.
2027: $5000 reserve against new collection management building.
2028: New roof for the Bury House
2028: $5000 reserve against new collection management building. 2029: $5000 reserve against new collection management building.
As proposed in 2023, Darrell Randell suggests that Sombra Museum match the capital reserve for seed money to save for the new collection management building needs, beginning in 2024, contributing the same amount yearly.
Moved by: Darrell Randel Seconded by: Shelley Lucier
Motion #1 that the Capital Budget proposal for 2024‐2029 is approved by the Sombra Museum Board to be sent to Council.
CARRIED
Adjournment at 3:47 pm, Tuesday, October 15, 2024.
Project Name Parks Vehicle & Equipment Reserve Build Up
Work In Progress (WIP) no
Project Description/Need for Work
Parks Vehicle & Equipment Reserve Build Up
Project Priority PE 1 Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Reserve
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Project Name Zamboni
Work In Progress (WIP) no
Project Description/Need for Work
This project involves the purchase of a new Zamboni ice resurfacing machine to replace the existing unit, which is currently at half of its expected lifespan. As a double pad facility, we rely on two Zambonis to maintain optimal ice conditions for our community events, public skating, and hockey programs
In 2019 we bought 2 new units, if we unload one now we get a good trade and offsite replacements
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Project Name Gator
Work In Progress (WIP) No
Project Description/Need for Work
We need to start replacing our Gator fleet that serves our community services department, we have multiple
gators at ball diamonds, and one with the horticultural team We would like to replace 1 per year over the next several years
A new gator can cost up to 35,000 we will be looking for good used units for our replacements
Project Priority PE2 Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Project Name Ball Diamond Groomer
Work In Progress (WIP) No
Project Description/Need for Work
Looking at Replacing a ball diamond groomer
Project Priority PE3 Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Project Name Guthrie River Washrooms
Work In Progress (WIP) Designs are done, going out for tender soon
Project Description/Need for Work
The washrooms along the river are at the end of their life cycles they all were installed in the 1960’s when the Parkway
Commission operated these parks. If we are going to start adding new washrooms that did not exist before than we
should start to replace the existing washrooms that we have along the river There are 5 existing washrooms that could be replaced over the next 5 years
We looked at another option of refurbishing the ones we have this would require beefing up the block walls, new roof
Closing in the block walls, making them weather tight, and this would result in 2 fully accessible washrooms/not heated
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacemen Growth Related Needs
Service Enhancement Other
Useful Live (Years) 25
Life Cycle
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Project Name Dugouts/Bleachers/Fences
Work In Progress (WIP) Yes/No Previous project #
Project Description/Need for Work
Dugout Replacement Throughout the township Bleachers replacement throughout the township
Fences replacement throughtout the township-sports field parks was the focus of our attention now we are going to look at our bordaring fences throughout the township parks
This program has been very succesful, with multiple dugouts, bleachers and fencing replaced to date
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 25
Safe for public use in all our parks
Replace what is not safe or past its life cycle
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Project Name Play Ground upgrade and replace resurfacing
Work In Progress (WIP) No
Project Description/Need for Work
Various parks resurfacing We need to transition to the engineered wood fibres
First phase of this project was completed in 2022 with 60,000 being spend, this got 5 major playgrounds completed
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Protective surfacing needs to be redone
End of its Life cycle
Accessible playgorunds
Accessible playgorunds
Useful Live (Years)
10
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost
Other – Protective shade structure
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Project Name CAP Tennis/Pickle Ball Court Surfacing
Work In Progress (WIP) No
Project Description/Need for Work
Finshing of 2024 project the courts need the sufacing applied this year.
This was intentional to allow them to settle over the winter before the application.
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 10
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost
Other – Protective shade structure
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Project Name Park Signs thoughout the township
Work In Progress (WIP) Yes/No Previous project #
Project Description/Need for Work
Park signs throughout the township need to be replaced. We would like to bring a design to council for approval early in 2023 and start to replace so many a year, we received a budgetary quote of $1,500 per sign, but they do vary
and size.
The 2023 signs are still set to be installed this year.
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 25
Asthetics of them
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Department Community Services
Service/Program Park Facilities
Project Name Stewart Ball Park New Washrooms
Work In Progress (WIP) no
Project Description/Need for Work
The maintenance shed at Stewart, is an old block walled building that sits on 600 ft2 cement pad, it has a
Storage area for Minor ball that is used to store equipment. There is also a set of washrooms in this park
Refurbish the entire building from washrooms, exterior of the building chaulking, mortar, and painting We have moved this one up the priority list as there is substatialy failure in the cement slab forcing us to close one of the washrooms in 2024
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 30
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Department Community Services
Service/Program Park Facilities
Project Name Wilkesport Drainage
Work In Progress (WIP) no
Project Description/Need for Work
This project focuses on repairing the drainage system associated with Wilkesport Park/Community Hall, which has been identified as a significant contributor to water damage on a neighboring property along the river. The current drainage issues are causing erosion and potential structural damage,
necessitating immediate attention to protect both community assets and private properties. Drainage Department to assist with this project
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 50
Portions washing away neighbours property Shoreline protection
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Department Commuinty Services
Service/Program Parks
Project Name Brigden Lights
Work In Progress (WIP) No
Project Description/Need for Work
Relamp with LED, these lights have been givnig us issues the last few years
Lighting is becoming an issue throuhgout the township, currently we have 5 lit diamonds with only one of them at the beginning of its life cycle
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost
Other – Protective shade structure
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Project Name Wilkesport Slpash Pad Repair
Work In Progress (WIP) No
Project Description/Need for Work
Wilkesport splashpad has been heaving more and more over each spring thaw and it has gotten to the point where we will not be allowed to open, we called in the original contractor and they want to install drainage in the area
Splashpad commissioning, existing Hardscapes removal, place and compact granular, install fibre-reinforced concrete
Site Drainage, Splashpad feature install, feature bonding, splahpad brain install, landscaping earthworks.
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 10
Cement cracking and toe catches Pad is failing
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Department Community Services
Service/Program Park Facilties
Project Name Cement Pad at Port Lambton Pavilion
Work In Progress (WIP) No
Project Description/Need for Work
Motion Passed to explore putting a cement pad in the pavillion in Port Lambton for accessibility purposes.
A very rough estimate would be $30,000, to make it truly assessible it should get connected to the parking lot and the washrooms, this would drive the cost up higher.
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 15
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates)
Reserves/Reserve Funds General reserves Equipment reserves
DC reserves
Other -St. Clair Educ. & Envir.
Long Term Financing
Debenture Lease
Total Financing
Department Community Services
Service/Program Park Facilities
Project Name CAP Basketball Courts
Work In Progress (WIP) No
Project Description/Need for Work
Surfacing of the pavement that was just installed in 2024, this would be a joint effort with the Optimist Club
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 25
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Department Commuinty Services
Service/Program Parks
Project Name Stewart Lights
Work In Progress (WIP) No
Project Description/Need for Work
Price to relamp – would like Courtright to be used fully before persuing this project, but numbers anyway Might have a bad post, looking into this this fall
Lighting is becoming an issue throuhgout the township, currently we have 5 lit diamonds with only one of them at the beginning of its life cycle
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 10
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost
Other – Protective shade structure
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Lights need updating, stress crack on one post
Lighting is becoming an issue throuhgout the township, currently we have 5 lit diamonds with only one of them at the beginning of its life cycle
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 20285 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost
Other – Protective shade structure
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Department Community Services
Service/Program Park Facilities
Project Name O’Dell (Cameron Ball Park) Maintenance Shed with Public Washrooms
Work In Progress (WIP) No
Project Description/Need for Work
The maintenance shed at Cameron, is an old block walled building that sits on 1000 ft2 cement pad, it has a
maintenance area that is used to store equipment and supplies to do the 7 diamonds in corunna
There are 2 washrooms on the west side of the building.
Refurbish the entire building from washrooms, exterior of the building chaulking, mortar, and painting
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement
Building interior is past its life cycle
Growth Related Needs
Service Enhancement
Other
Useful Live (Years)
30
Project Budget Total Expenditures/
Year 1
Year 2
Year 3
Year 4
Year 5
Expenditures: Financing 2025 2026 2027 2028 2029
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Department Commuinty Services
Service/Program Parks
Project Name Brander Park Breakwall Repair
Work In Progress (WIP) No
Project Description/Need for Work
Breakwall is failing on parts of Brander, need to start replacing/repairing
St. Clair Conservation Authority will start the next wave of parks to receive shoreline funding, Brander was at the top of the list Currently Township reserves are exhausted for this project
\
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost
Other – Protective shade structure
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Project Name Courtright Main Diamond Lights
Work In Progress (WIP) No
Project Description/Need for Work
Relamp Eric MacKenzie Field. It has approxiamelty 24 lights not working out of the 104 fixtures. Combination of bulbs and ballasts. The cement poles would be reused they just need to be relamped with new controller These lights were installed in the early 90’s.
We looked at a budgetary number for this and hopes that the associations involved will be able to apply for grants for this
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 25
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Project Name Sombra Ball Park Playground
Work In Progress (WIP) No
Project Description/Need for Work
The current structure at Sombra Ball Park, is coming to the end of its life, we are looking into all options as we move
forward with so many ammenities. This playground is a Bel-Air, which this company does not exist, hoping to
look at refurbishing instead of replacement this is hard as companies do not want work on other companies
equipment do to liability issues.
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement
Nearing end of Life
Growth Related Needs
Service Enhancement
Other
Useful Live (Years)
20
Project Budget Total Expenditures/
Year 1
Year 2
Year 3
Year 4
Year 5
Expenditures: Financing 2025 2026 2027 2028 2029
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Department Commuinty Services
Service/Program Parks
Project Name Brander Pond Fountain
Work In Progress (WIP) No
Project Description/Need for Work
Brander park east has a large pond, by its garden and dock area, this spot is utilized multiple times a year for weddings
and gatherings, one issue we have here is the pond does get quite stagnent throughout the year and a solution would be
to add a foutain to aerate the pond continously.
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 10
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost
Other – Protective shade structure
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Service/Program Park Facilities
Project Name Brigden Tennis Court Repair
Work In Progress (WIP) No
Project Description/Need for Work
This tennis court also has some cracks that are in need of repairs. It is not as highly used as our courts as CAP This would include turning one tennis court into 4 pickle ball courts doubling our Pickle ball courts in Corunna
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 10
Cracking continues, safety issue
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Service/Program Park Facilities
Project Name Paddock Green Playground
Work In Progress (WIP) No
Project Description/Need for Work
Moore Optimist would like us to add a playground structure to Paddock Green Park. They would like to put in cost share this project and put in $30,000
This wiill be our 22 Play Structure in St. Clair Township
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 20
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Service/Program Campgrounds
Project Name Mooretown Campground
Work In Progress (WIP) No
Project Description/Need for Work
Back washroom that sits in the middle of the campground, needs a roof replacement. The flat roof insulation no longer
functions correctly to move water toward the drain. This rood does not drain correctly. Due to the constant ponding water
there has been alligatoring of the membrane and severe granular loss.
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years)
At life expectancy
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Project Name Cathcart Washroom Tiles
Work In Progress (WIP) New
Project Description/Need for Work
The Cathcart Washrooms, an essential facility at the municipal campground, require a complete renovation of their bathroom tiles due to significant wear and deterioration. The current tiles have surpassed their expected lifespan, resulting in safety hazards, unsightly conditions,
and increased maintenance costs. This project aims to replace the existing tile with durable, aesthetically pleasing materials that enhance the user experience and ensure compliance with health and safety standards Project Priority C2 Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 20
End of Life cycle New amenity
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Other-Please provide supporting documentation, quotes, operation budget
Project Name Playgrounds
Work In Progress (WIP) Not Completed in 2024- carried over
Project Description/Need for Work
All three campgrounds playgrounds are nearer there end of life, and should be replaced We would like to propose a new playground 1 per year over the next 3 years Mooretown, Cathcart, Branton Cundick
Project Priority C2 Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 20
End of Life cycle New amenity
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2024 2025 2026 2027 2028
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Project Name Mooretown Camp Washroom
Work In Progress (WIP) No
Project Description/Need for Work
The Mooretown Front Washrooms, an essential facility at the municipal campground, require a complete renovation of their bathroom tiles due to significant wear and deterioration. The current tiles have surpassed their expected lifespan, resulting in safety hazards, unsightly conditions,
and increased maintenance costs. This project aims to replace the existing tile with durable, aesthetically pleasing materials that enhance the user experience and ensure compliance with health and safety standards Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 20
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Project Name Mooretown Campground Hydro Replacement
Work In Progress (WIP) No
Project Description/Need for Work
All hydro in the ground at Mooretown Campground needs to be upgraded, The wire is insufficent for the power needed for the newer trailers and increase in power that these units are using.
Currently we can’t keep breakers on to run the pods at full capacity, so we have reduced the usage by reducing the amount of trailers on the pods.
Please see attached description of the ligistics of doing this project.
Project Priority C4 Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 50
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Project Name Clubhouse Refurbishment
Work In Progress (WIP) Yes Carry forward
Project Description/Need for Work
The golf course clubhouse has served its patrons proudly for the last 50 plus years and it is now time to add
signifigant funds towards the improvement of the Accessibilty and Kitchen function along with finishing the curb appeal
and sealing the foundation
We would like to propose a $100,000 towards architecture and engineering fees to bring proposals for approval
Project Priority G1 Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years)
Accessiblity
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2024 2025 2026 2027 2028
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Project Name Bunker Program
Work In Progress (WIP) Yes 2nd year of the project
Project Description/Need for Work
In 2015 we took on an in house bunker project, this involved reducing a lot of the bunkers by filling them in and making the
project less expensive, at this time there wasn’t a lot of money to go around for such a project and unfortunately a lot of
corners had to be cut to get the project done, this has caught up to us and the bunker again need a major over haul to improve their appearance, drainage and playbility, we have looked into multiple
options for liners and sand to undertake the project, we would like to divide the project up over 3 years
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Project Name Golf Cart
Work In Progress (WIP)
Project Description/Need for Work
Purchase, 10 Slightly Used 2022 precedent golf carts to match the last 20 carts that were purchased
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement
5 carts to be traded do not run anymore
Growth Related Needs
Service Enhancement
Other
Useful Live (Years)
Project Budget Total Expenditures/
Year 1
Year 2
Year 3
Year 4
Year 5
Expenditures: Financing 2025 2026 2027 2028 2029
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Project Name Golf Cart GPS system
Work In Progress (WIP) No
Project Description/Need for Work
This project focuses on equipping the golf carts at our facility with GPS technology to enhance asset management, improve operational efficiency, and reduce costs associated with damage and fee giveaways. With a fleet of 80 golf carts, implementing GPS will provide real-time tracking and monitoring, helping to safeguard assets and optimize usage.
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Less staff traffic on Golf Course
Savings on reduction of give aways
Protecting high valued assets
Pace of play with increase
Allowing us to charge more per round
Useful Live (Years)
Project Budget Total Expenditures/
Year 1
Year 2
Year 3
Year 4
Year 5
Expenditures: Financing 2025 2026 2027 2028 2029
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Project Name Tractor
Work In Progress (WIP)
Project Description/Need for Work
This project involves the purchase of a new tractor to replace the existing unit, which is currently at the midpoint of its expected lifespan. The current tractor has become less reliable, leading to increased maintenance costs and downtime, which impacts overall productivity. A new tractor will
enhance our operational efficiency, improve service delivery, and support various tasks within the facility.
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Project Name Tees/Collars Mower
Work In Progress (WIP) No
Project Description/Need for Work
This project involves the purchase of a high-quality used mower specifically designed for maintaining tees and collars on the golf course. The current mower has reached the end of its operational life, resulting in increased maintenance costs and inconsistent performance. A reliable used mower will
enhance turf quality, improve operational efficiency, and ensure the course remains in optimal condition for golfers.
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 15
Life cycle
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Project Name Greens/Tee Surrounds Mower
Work In Progress (WIP) No
Project Description/Need for Work
This project involves the purchase of a new surrounds mower to replace the existing unit, which has reached the end of its operational life. The current mower is becoming increasingly unreliable, resulting in higher maintenance costs and inconsistent performance. A new surrounds mower will
enhance the quality of turf maintenance, improve operational efficiency, and ensure that our facilities remain in excellent condition for users.
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 15
Life cycle
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
This project involves the purchase of a new rough mower to replace the existing unit, which has reached the end of its operational life. The current mower is becoming increasingly unreliable, resulting in higher maintenance costs and inconsistent performance. A new surrounds mower will
enhance the quality of turf maintenance, improve operational efficiency, and ensure that our facilities remain in excellent condition for users.
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 15
Life cycle
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
2025 Public Works Capital Budget
The revised Core Asset Management Plan served as an input to the 2025 Public Works Capital Budget. It serves as the most current reflection of the state of core infrastructure & improved life cycle information which provides a more informed current state of infrastructure allowing for more informed decision making when allocating funds and maximizing the value of the budget investment.
Some of significant core capital expenditures that the Township is facing in the short term are related to bridges; the reconstruction of St. Clair Parkway bridge over Marshy Creek at just under $4.45 mil was pushed to 2025 due to poor tender pricing & the reconstruction of Ward Line over Marshy Creek at
$3.06 mil will also be targeted for next year. The second St. Clair Parkway bridge over Marshy Creek & St. Clair Parkway Bridge over Sweeny Drain will be pushed to 2026 to avoid two Parkway locations to be shut down in 2025. Both of these bridges will require significant reconstruction capital dollars. In addition there are two seawall projects requiring reconstruction to protect Township assets.
Shoreline erosion is also creating areas of costly rehabilitation. The Sombra Water Street Seawall is estimated at over $3mill and was deferred to 2025 and the Parkway Slope Reconstruction south of Oil Springs Line, North of Seger Park which has closed the associated trail several times – detailed design is complete with estimated cost at approximately $5mil. The Corunna Pump Station Seawall is also deteriorating considerably and is yet to have a detailed cost estimated but has a slightly smaller scope of work relative to Water St.
The Tom Street Sanitary Main Relocation Project now has an estimate of $3.3mil for the recommended alternative. The current location of the main has high risk attached to it so is targeted to be completed over the next couple of years.
Also identified in the Asset Management Plan, road rehabilitation is considerably underfunded annually. This results in rural surface treated roads (tar & chip) to be completed every other year due to budget constraints. Urban resurfacing of asphalt streets also has been completed in the opposite “every other year” pattern. This frequency of resurfacing both urban and rural hard surface roads is not sufficient to keep up with deterioration. Ultimately the level of service of roads is eroding which is in turn driving up roadway maintenance such as road patching creating significant road maintenance budget overages.
Public Works is recommending urban resurfacing in 2025 and each year afterwards to begin to close the roads financial gap. The 2025 recommended urban resurfacing project will be in the order of $250k. It should be noted that this still leaves a $1.75 million annual financial gap to maintain the current roads LOS.
There are a number of additional initiatives underway which will drive added costs going forward.
Public Works is working with Jacobs to complete the wastewater master plan. The preliminary sanitary gathering model identified that the Corunna and Courtright Pump Stations were undersized for current and future loads as well as an undersized section of gathering main and will require upsizing within the
next few years. The remaining master plan may identify additional upgrades required to maintain network flows.
The water master plan was completed and recommends the addition of pressure sensors in key locations for monitoring purposes and to provide important information on how the network is handling peak loads. Capital funding is being requested to begin enhancing the system with pressure sensing.
Improvements to the flushing program were also included in the water master plan that capture plans to achieve scour of the watermain in several system segments. Additional segments will be added over the next few years until the entire system is captured. This will require funding to support the cost of the upgraded flushing program development.
The Active Transportation Master Plan is also close to completion. There will be a number of recommendations resulting from this plan which include additional bike and multi-use paths across the Township. The recommended road diet on Hill St. would be tied to the County’s Hill St. road reconstruction targeted for 2027 or 2028. Many of the other recommended path additions would be tied to the associated road reconstruction which in most cases is a number of years away.
The work related to the relocation of the Nova St. Clair Water Meter initiative is ongoing with a finalized design and the acquisition of Hydro approvals ongoing for the placement of the new meter on their lands adjacent to the LAWSS Main. Construction of the new meter will be finalized in 2025 once Hydro approval is received.
In 2025 the work will begin on the Courtright Wastewater Treatment Plant Expansion detailed design as well as the development of the contract to serve as the agreement with the final construction contractor.
In 2025 the Township will complete the update of the Township Asset Management Plan to meet the Ontario Regulations which require the capture of Proposed LOS for 10 years as well as the related Lifecycle Management Plan, Financial Strategy & Risk Assessment.
Department Engineering
Service / Program Roads
Project Name Rural Surface Treatment
Work In Progress (WIP) No
Project Description / Need for Work
This project includes the application of microsurfacing treatment to rural low class bituminous roads in accordance with our asset management plan. This budget includes the application of emulsified asphalt as a preservation technique on low class roads which were treated 10 to 15 years ago to extend lifecycle. Road selection will be completed in 2025 and provided to Council as information.
Comments
Useful Live (Years) 15 years
Financing:
External Sources
Grants/Subsidies –
Direct Development Contrib. –
External contribution –
Others (Fundraising) –
Revenue Fund
From Operations (tax base) 1,875,000.00 575,000.00 625,000.00 675,000.00
From Operations (User rates) –
Reserves/Reserve Funds
General reserves –
Equipment reserves –
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 1,875,000.00 575,000.00 – 625,000.00 – 675,000.00
Department Engineering
Service/Program Roads
Project Name Urban Asphalt Resurfacing
Work In Progress (WIP) No
Project Description/Need for Work
This project includes curb & gutter repairs, manhole repairs and the milling and resurfacing of urban asphalt roads. This 5 year capital spending plan is consistent with our asset management plan. Roads shall be resurfaced in terms of; pavement age, distress and lifecycle costs in accordance with the Township approved asset management plan.
Routine resurfacing extends pavement life by 10-15 years
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 15
Prolongs useful life AMP Priority
Improves drainage, ride quality and friction
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Department Engineering
Service/Program Roads
Project Name Tom Street Sewer Relocation
Work In Progress (WIP) No
Project Description/Need for Work
This project includes the reconstruction of Tom Street, Sandstone Street, Fieldstone Avenue, and Beresford Street as required to relocate the Tom Street Sanitary Sewer.
Comments
Health or Safety Issues MEDIUM
Cost Saving/Paybacks
Asset Maintenance/Replacement MEDIUM
Growth Related Needs
Service Enhancement HIGH
Other
Useful Live (Years) 25
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies
Land –
Asset Purchase 1,520,000.00
Utilties/Design 228,000.00
Furnishing/Equipment
Sitework/Landscaping –
Contingency –
Interim Financing Cost –
Other –
–
Total Expenditures 1,748,000.00 1,748,000.00 – – – –
Financing:
External Sources
Grants/Subsidies –
Direct Development Contrib. –
External contribution –
Others (Fundraising) –
Revenue Fund
From Operations (tax base) 1,748,000.00 1,748,000.00
From Operations (User rates) –
Reserves/Reserve Funds
Wastewater reserves – –
Equipment reserves –
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 1,748,000.00 1,748,000.00 – – – –
Department Engineering
Service / Program Roads
Project Name Steadman Street Reconstruction
Work In Progress (WIP) No
Project Description / Need for Work
This project includes the complete reconstruction of Steadman Street in Brigden, increasing its current level of service from a surface treated road to an urban cross section complete with sidewalks, drainage, curb and gutter, and asphalt. The road is located adjacent to a school and is heavily used by pedestrians and buses. Staff intends to work closely with the school board so that the improvements can coincide with any necessary bus staging.
Project Budget
Expenditures:
Studies
Land
Asset Purchase
Utilities/Design
Furnishing/Equipment
Sitework/Landscaping
Contingency
Interim Financing Cost
Other
Total Expenditures
Financing:
Comments
Adding sidewalk for pedestrian safety Community priority
Increases level of service
External Sources
Grants/Subsidies –
Direct Development Contrib. –
External contribution –
Others (Fundraising) –
Revenue Fund
From Operations (tax base) 440,000.00
From Operations (User rates) –
Reserves/Reserve Funds
General reserves –
Equipment reserves –
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 440,000.00 – – – – –
Department Engineering
Service / Program Roads
Project Name Duncan Street Reconstruction
Work In Progress (WIP) No
Project Description / Need for Work
This project includes the complete reconstruction of Duncan Street in Brigden, increasing its current level of service from a surface treated road to an urban cross section complete with updated sidewalks, drainage, curb and gutter, and asphalt. The road is located adjacent to a school and is heavily used by pedestrians and buses. Staff intends to work closely with the school board so that the improvements can coincide with any necessary bus staging.
Project Budget
Expenditures:
Studies
Land
Asset Purchase
Utilities/Design
Furnishing/Equipment
Sitework/Landscaping
Contingency
Interim Financing Cost
Other
Total Expenditures
Financing:
Comments
Updating sidewalks to meet current design standards Community priority
Increases level of service
External Sources
Grants/Subsidies –
Direct Development Contrib. –
External contribution –
Others (Fundraising) –
Revenue Fund
From Operations (tax base) 220,000.00
From Operations (User rates) –
Reserves/Reserve Funds
General reserves –
Equipment reserves –
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 220,000.00 – – – – –
Project Name Water Street Seawall Replacement Work In Progress (WIP) Yes/No Previous project # 2023-104 Project Description/Need for Work
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacemen Growth Related Needs
Service Enhancement Other
Useful Live (Years) 50
Failing seawall AMP priority
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Long Term Financing Debenture
Lease
Total Financing
Project Name Polymoore Drive Rehabilitation – North Branch to 675m South
Work In Progress (WIP) Yes/No Previous project # N/A
Project Description/Need for Work
The reconstruction of Polymoore Drive from the north branch of Polymoore Drive to 675 metres south is considered a high priority in the Asset Management Plan. The proposed project includes the pulverizing of existing road and base material and the placement of new hot-mix asphalt to an industrial standard. A similar process was utilized in the reconstruction
of the Polymoore Drive entrance in 2010 and has performed very well. The road is currently in poor condition
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacemen Growth Related Needs
Service Enhancement Other
Useful Live (Years) 25
AMP priority
Services industrial and commercial business Restores acceptable service levels
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves
DC reserves (Industrial Park) Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 15-20
AMP Priority
Improves drainage, ride quality and friction
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 15-20
AMP Priority
Improves drainage, ride quality and friction
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
This project includes the rehabilitation of the existing asphalt road with cold-in-place recyling technology and the placement of a hot-mix wearing course. This project is a high priority in the asset management plan. Project is 6.2km in length
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 15-20
AMP Priority
Improves drainage, ride quality and friction
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Department Engineering
Service/Program Roads
Project Name Brigden Road – Village to Plank Road
Work In Progress (WIP) Yes/No Previous project # N/A
Project Description/Need for Work
This section of Brigden Road was rehabilitated with cold-in-place recycling in 2007. The plan year for this project is 2028, which is 21 years from the original rehabilitation date. This is a prime opportunity to re-invest in this asset by performing a simple hot-mix overlay, extending the life by another 10-15 years. Project is 8.2km in length
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 15
AMP Priority
Improves drainage, ride quality and friction
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Department Engineering
Service/Program Roads
Project Name St. Clair Parkway – Lasalle Line to Shell Main Entrance
Work In Progress (WIP) Yes/No Previous project # N/A
Project Description/Need for Work
This section of St. Clair Parkway is rated very poor and is a major trucking and transportation artery for the Shell Refinery.
Staff is proposing that this section be completely reconstructed to a major arterial standard with new granular material and hot-mix asphalt.
Project Priority Indicate High/Medium/Low Comments
Health or Safety Issues Cost Saving/Paybacks
Asset Maintenance/Replacement Growth Related Needs
Service Enhancement Other
Useful Live (Years) 15
AMP Priority
Improves drainage, ride quality and friction
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies Land
Asset Purchase Utilties/Design Furnishing/Equipment Sitework/Landscaping Contingency
Interim Financing Cost Other
Total Expenditures Financing:
External Sources
Grants/Subsidies
Direct Development Contrib.
External contribution
Others (Fundraising)
Revenue Fund
From Operations (tax base) From Operations (User rates) Reserves/Reserve Funds
General reserves Equipment reserves DC reserves
Other -St. Clair Educ. & Envir. Long Term Financing Debenture
Lease
Total Financing
Department Public Works
Service / Program Storm
Project Name Road Storm Culvert Replacements
Work In Progress (WIP) No Previous project #
Project Description / Need for Work
Many corruagated steel culverts located under the St. Clair Parkway and under rural roads are severely deteriated (collapsing) and require immediate replacement. Most of the affected pipes were originally installed in the 1960’s and 1970’s and are well beyond their servicable life. Approx. 10 pipes per year are identifed as being the highest priority and should be replaced in 2025. Seven years of this program have been completed in 2018-2024. The work includes the full replacement of the existing pipes with new HDPE pipes, and complete restoration (asphalt, curbs, catch basins, etc.)
Comments
Useful Live (Years) 50 years
Financing:
External Sources
Grants/Subsidies –
Direct Development Contrib. –
External contribution –
Others (Fundraising) –
Revenue Fund
From Operations (tax base) 565,000.00 100,000.00 100,000.00 120,000.00 120,000.00 125,000.00
From Operations (User rates) –
Reserves/Reserve Funds
General reserves –
Equipment reserves –
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 565,000.00 100,000.00 100,000.00 120,000.00 120,000.00 125,000.00
Department Engineering
Service/Program Storm Sewer
Project Name Tom Street Sewer Relocation
Work In Progress (WIP) No
Project Description/Need for Work
As part of the Tom Street Sanitary Sewer Relocation project, the design engineer has highlighted several areas of concern with the existing storm sewer. While the area is under construction, it is highly recommended that these areas be addressed to prevent future excavation prior to the end of service life.
Financing:
Comments
Risk of failure
External Sources
Grants/Subsidies –
Direct Development Contrib. –
External contribution –
Others (Fundraising) –
Revenue Fund
From Operations (tax base) 184,000.00 184,000.00
From Operations (User rates) –
Reserves/Reserve Funds
Wastewater reserves – –
Equipment reserves –
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 184,000.00 184,000.00 – – – –
Department Public Works
Service / Program Municipal Drains
Project Name 10 Year Drain Debenture (Barnes Drain)
Work In Progress (WIP) No Previous project #
Project Description / Need for Work
The move-off of the Barnes Drain along Bridgen Road between Smith Line and Kerr Line was completed in 2013. A large portion of the is cost was assessed to the Township (benefit to Brigden Road). The Township assessment is debentured over a 10 year period between 2018 – 2027 (first payment in 2018).
Comments
Useful Live (Years) 50 years
Financing:
External Sources
Grants/Subsidies –
Direct Development Contrib. –
External contribution –
Others (Fundraising) –
Revenue Fund
From Operations (tax base) 245,502.00 81,834.00 81,834.00 81,834.00
From Operations (User rates) –
Reserves/Reserve Funds
General reserves –
Equipment reserves –
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 245,502.00 81,834.00 81,834.00 81,834.00 – –
Department Public Works
Service / Program Municipal Drains
Project Name Hubbard Drain
Work In Progress (WIP) Yes Previous project # 2024-252
Project Description / Need for Work
Spriet Associates has been appointed under section 78 of the Drainage Act to prepare a report and design to install a pump at the bottom end of the Hubbard Drain. The watershed of the Hubbard Drain experienced high water levels in 2019 & 2020, and a pump would alleviate these issues. Project is currently in Engineering phase and obtaining DFO approvals. This was an approved 2020 capital project – carry this project forward
Comments
Useful Live (Years) 50 years
Financing:
External Sources
Grants/Subsidies 15,000.00 15,000.00
Direct Development Contrib. –
External contribution 260,000.00 260,000.00
Others (Fundraising) –
Revenue Fund
From Operations (tax base) 25,000.00 25,000.00
From Operations (User rates) –
Reserves/Reserve Funds
General reserves –
Equipment reserves –
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 300,000.00 300,000.00 – – – –
Department Public Works
Service / Program Municipal Drains
Project Name Gray Drain East
Work In Progress (WIP) Yes Previous project # 2024-255
Project Description / Need for Work
R. Dobbin Engineering completed a section 78 engineers report to specify the replacement of a portion of enclosed drain on the Gray Drain East, and enclose the remaining open ditch. Report has been submitted and by-law passed. Construction work expected in 2025. This project was approved in 2020 budget – carry this project forward
Comments
Useful Live (Years) 30 years
Financing:
External Sources
Grants/Subsidies 15,000.00 15,000.00
Direct Development Contrib. –
External contribution 30,000.00 30,000.00
Others (Fundraising) –
Revenue Fund
From Operations (tax base) 25,000.00 25,000.00
From Operations (User rates) –
Reserves/Reserve Funds
General reserves –
Equipment reserves –
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 70,000.00 70,000.00 – – – –
Department Public Works
Service / Program Municipal Drains
Project Name Parr Drain North (south side of Brigden)
Work In Progress (WIP) Yes Previous project # 2024-256
Project Description / Need for Work
Spriet Associates completed a survey and preliminary design work to replace existing tile drain and ditch along east side of Brigden Road and the south end of the Village of Brigden (Adelia Str.). The Engineer was appointed in May 2009 and the project has been delayed due to the priority of other projects. Currently paid $25,000 for Engineering for services and report is 75% complete. The 2011 Capital Budget allocated $50,000 towards this project. This was an approved 2020 capital project, however the estimate of cost has increased. Carry this project forward for Engineering only of 2025
Comments
Useful Live (Years) 75 years
Financing:
External Sources
Grants/Subsidies 10,000.00 10,000.00
Direct Development Contrib. –
External contribution 150,000.00 150,000.00
Others (Fundraising) –
Revenue Fund
From Operations (tax base) 420,000.00 40,000.00 380,000.00
From Operations (User rates) –
Reserves/Reserve Funds
General reserves –
Equipment reserves –
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 580,000.00 40,000.00 540,000.00 – – –
Department Public Works
Service / Program Municipal Drains
Project Name Old River Road Drain
Work In Progress (WIP) Yes Previous project # 2024-257
Project Description / Need for Work
R. Dobbin Engineering was appointed in 2013 to prepare a report and recommendations for a new Municipal Drain along the west side of Old River Road providing a proper outlet for storm wator of Old River Road, Crescent Drive and Central Drive. This work was put on hold untilplans for the Baby Point subdivision (on east side of road) were finalized. Since the storm sewer system has been installed for the subdivison, this project can now move forward. Existing outlet pipe currently draining the road ditch crosses private property and therefore can not be improved without a new Municipal Drain. Report submitted in 2022, but referred back to Engineer for a major change of project of scope. Approved in 2021 budget. Carry this project forward (increased budget)
Comments
Useful Live (Years) 75 years
Financing:
External Sources
Grants/Subsidies –
Direct Development Contrib. –
External contribution 215,000.00 215,000.00
Others (Fundraising) –
Revenue Fund
From Operations (tax base) 285,000.00 50,000.00 235,000.00
From Operations (User rates) –
Reserves/Reserve Funds
General reserves –
Equipment reserves –
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 500,000.00 50,000.00 450,000.00 – – –
Department Public Works
Service / Program Municipal Drains
Project Name Henry Drain
Along north side of Wilkesport Line.
Work In Progress (WIP) Yes Previous project # 2024-258
Project Description / Need for Work
A request has been received from a ratepayer to improve the Henry Drain. The Henry Drain consists of an open ditch and sub-tile drain along the north side of Wilkesport Line, on both east and west sides of Highway 40. The sub-tile was installed in 1912 and is in very poor condition (multiple tile breaks). A new Engineers report is now required to improve this drain. Final report is expected to be submitted in late 2024, with a final by-law in early 2025. Due to the large Municipal assessment for this project it may need to be budgeted over two years. This project was approved in 2021 budget, for Engineering only. Carry this project forward
Comments
Useful Live (Years) 75 years
Financing:
External Sources
Grants/Subsidies 230,000.00 230,000.00
Direct Development Contrib. –
External contribution 710,000.00 710,000.00
Others (Fundraising) –
Revenue Fund
From Operations (tax base) 680,000.00 340,000.00 340,000.00
From Operations (User rates) –
Reserves/Reserve Funds
General reserves –
Equipment reserves –
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 1,620,000.00 340,000.00 1,280,000.00 – – –
Department Public Works
Service / Program Municipal Drains
Project Name McDonald-Andrews Drain
Work In Progress (WIP) Yes Previous project # 2024-259
Project Description / Need for Work
Engineer appointed to complete a new re-assessment report on the existing McDonald-Andrews Drain, to provide an updated schedule of assessment (replace 1916 report). Site meeting held in May, 2022, and Spriet Assoc. currently working on report. This report was up-graded in 2023 to be section 78 (improvement) report. Report was submitted in early 2024, and went through Consideration meeting and then Court of Revision. Council sent the report back to Enginee at Court of Revsion meeting.
Comments
Useful Live (Years) 75 years
Financing:
External Sources
Grants/Subsidies 60,000.00 60,000.00
Direct Development Contrib. –
External contribution 170,000.00 170,000.00
Others (Fundraising) –
Revenue Fund
From Operations (tax base) –
From Operations (User rates) –
Reserves/Reserve Funds
General reserves –
Equipment reserves –
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 230,000.00 230,000.00 – – – –
Department Public Works
Service / Program Municipal Drains
Project Name McDonald Drain No.2
Work In Progress (WIP) Yes Previous project # 2024-260
Project Description / Need for Work
Engineer appointed to complete a new report to provide 2 new access culverts, and replacement of one (1) existing access culvert and to provide a updated schedule of assessment for all future maintenance. Report has been submitted and By-law passed in 2022. Construction expected in 2025.
Comments
Useful Live (Years) 75 years
Financing:
External Sources
Grants/Subsidies 17,000.00 17,000.00
Direct Development Contrib. –
External contribution 33,000.00 33,000.00
Others (Fundraising) –
Revenue Fund
From Operations (tax base) –
From Operations (User rates) –
Reserves/Reserve Funds
General reserves –
Equipment reserves –
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 50,000.00 50,000.00 – – – –
Township of St. Clair Capital Project # 2025-
Capital Budget Data Collection Information Sheet – Year 2025 -2029
Department Public Works
Service / Program Municipal Drains
Project Name Lapier Branch Drain (Wilson)
Work In Progress (WIP) Yes Previous project # 2024-261
Project Description / Need for Work
Engineer appointed to complete a new report to construct a new petition drain (Wilson), provide an legal outlet for farm property on the north side of LaSalle Line, immediately east of Aamjiwnaang First Nations. New drain will consist of a pipe crossing under Lasalle Line and outlet into the Lapier Drain. This was approved in 2023 and 2024 Capital budget, and is now a carry-forward. New report submitted in late 2024, By-law passed, and construction expected in 2025.
Comments
Useful Live (Years) 75 years
Financing:
External Sources
Grants/Subsidies 3,000.00 3,000.00
Direct Development Contrib. –
External contribution 27,000.00 27,000.00
Others (Fundraising) –
Revenue Fund
From Operations (tax base) 20,000.00 20,000.00
From Operations (User rates) –
Reserves/Reserve Funds
General reserves –
Equipment reserves –
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 50,000.00 50,000.00 – – – –
Other-Please provide supporting documentation, quotes, operation budget
Department Public Works
Service / Program Municipal Drains
Project Name Watson Creek Drain
Work In Progress (WIP) Yes Previous project # 2024-263
Project Description / Need for Work
Engineer appointed to complete a new report to re-construct the lower end of the Watson Creek Drain, that is located in the Village of Sombra. Existing drain is failing and meanders residential lots, crosses streets, etc. Report expected in late 2025, and Engineering only required for 2025. Construction planned at a later date (2026 or later).
Comments
Useful Live (Years) 75 years
Financing:
External Sources
Grants/Subsidies –
Direct Development Contrib. –
External contribution 40,000.00 40,000.00
Others (Fundraising) –
Revenue Fund
From Operations (tax base) 60,000.00 20,000.00 40,000.00
From Operations (User rates) –
Reserves/Reserve Funds
General reserves –
Equipment reserves –
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 100,000.00 20,000.00 80,000.00 – – –
Department Public Works
Service / Program Municipal Drains
Project Name Pacific Branch Drain (Pump)
Work In Progress (WIP) Yes Previous project # 2024-264
Project Description / Need for Work
Engineer appointed to complete a new report to construct a pumping system for the upper end of the Pacific Branch Drain, located on the west side of Base Line Road, between Whitebread and Pointe Line. This improvement request signed by private property owners, and accepted by Council. Report submitted in late 2024, By-law passed and construction planned for 2025.
Comments
Useful Live (Years) 75 years
Financing:
External Sources
Grants/Subsidies 42,000.00 42,000.00
Direct Development Contrib. –
External contribution 88,000.00 88,000.00
Others (Fundraising) –
Revenue Fund
From Operations (tax base) 50,000.00 50,000.00
From Operations (User rates) –
Reserves/Reserve Funds
General reserves –
Equipment reserves –
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 180,000.00 180,000.00 – – – –
Department Public Works
Service / Program Municipal Drains
Project Name Campbell Drain (Brigden)
Work In Progress (WIP) Yes Previous project # 2024-265
Project Description / Need for Work
Engineer appointed to complete a new report to construct a new drain, extending the Campbell Drain across 80 Hwy (at Duncan St) and along the south side of 80 hwy, removing a portion of the upper watershed of the Parr Drain North. This project must be completed before a pending County road re-construction occurs. This project will also allow the pending replacement of the Parr Drain North to move forward. Report expected in early 2025, and construction planned for late 2025
Comments
Useful Live (Years) 75 years
Financing:
External Sources
Grants/Subsidies –
Direct Development Contrib. –
External contribution 175,000.00 175,000.00
Others (Fundraising) –
Revenue Fund
From Operations (tax base) 75,000.00 75,000.00
From Operations (User rates) –
Reserves/Reserve Funds
General reserves –
Equipment reserves –
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 250,000.00 250,000.00 – – – –
Department Public Works
Service / Program Municipal Drains
Project Name Eyre Branch Drain of Gray Drain
Work In Progress (WIP) Yes Previous project # 2024-266
Project Description / Need for Work
Engineer has been appointed under section 4 of the Drainage Act to prepare a report and design providing a way for a property on the west side of Kimball Road drain into the Gray Drain on the east side of Kimball Road. New drain will consists of pipe bored under the road. Report submitted in mid 2024, By-law passed in late 2024 and construction planned for late 2024. Costs assessed in 2025
Comments
Useful Live (Years) 75 years
Financing:
External Sources
Grants/Subsidies 4,000.00 4,000.00
Direct Development Contrib. –
External contribution 56,000.00 56,000.00
Others (Fundraising) –
Revenue Fund
From Operations (tax base) –
From Operations (User rates) –
Reserves/Reserve Funds
General reserves –
Equipment reserves –
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 60,000.00 60,000.00 – – – –
Department Public Works
Service / Program Trails / Sidewalks
Project Name Re-asphalt portion of River Trail
Work In Progress (WIP) No Previous project #
Project Description / Need for Work
After the completion of the River Trail through the “Trail Committee”, the Township has accepted the responsibility of maintaining this asset. The oldest sections of the trail were constructed in approx. 1999 and are now requiring re-asphalting. This is expected to be a yearly program (began in 2018) and will re-construct approx. 1km of trail per year. Two sections of trail are sellected to be for 2025 re-paving and are located (off-road) between Holt Line and Lambton Baptist Church (700m) and Lincoln Ave to Guthrie parking lot.
Comments
Useful Live (Years) 50 years
Financing:
External Sources
Grants/Subsidies –
Direct Development Contrib. –
External contribution –
Others (Fundraising) –
Revenue Fund
From Operations (tax base) 565,000.00 100,000.00 100,000.00 120,000.00 120,000.00 125,000.00
From Operations (User rates) –
Reserves/Reserve Funds
General reserves –
Equipment reserves –
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 565,000.00 100,000.00 100,000.00 120,000.00 120,000.00 125,000.00
Department Public Works
Service / Program Roads
Project Name Township Entry Signs – Replacement
Work In Progress (WIP) No Previous project #
Project Description / Need for Work
Replace existing “Welcome to St. Clair Township” signs located on the boundaries of the Township. Ten (10) existing grey timber signs are approximately 15 years old and have become outdated and difficult to maintain. New signs should be modernized and match established design used in all other villages for new signs installed in 2020-2023. Five of the ten signs were replaced in 2024, and the remaining five (if approved) will be replaced in 2025.
Comments
Useful Live (Years) 50 years
Financing:
External Sources
Grants/Subsidies –
Direct Development Contrib. –
External contribution –
Others (Fundraising) –
Revenue Fund
From Operations (tax base) 50,000.00 50,000.00
From Operations (User rates) –
Reserves/Reserve Funds
General reserves –
Equipment reserves –
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 50,000.00 50,000.00 – – – –
Department Public Works
Service / Program Roads
Project Name Pedestrian Crossover Improvements
Work In Progress (WIP) No
Project Description / Need for Work
Design and installation of improved Pedestrian Crossovers (PXOs) to be compliant with updated regulations. The first location is at Lyndoch Street and Cameron Street in Corunna. The second location is along the St. Clair Parkway near Riverview Central Public School to enhance the current Level 2: Type D crossing.
Comments
Useful Live (Years) 20 years
Financing:
External Sources
Grants/Subsidies –
Direct Development Contrib. –
External contribution –
Others (Fundraising) –
Revenue Fund
From Operations (tax base) 315,000.00 200,000.00 115,000.00
From Operations (User rates) –
Reserves/Reserve Funds
General reserves –
Equipment reserves –
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 315,000.00 200,000.00 115,000.00 – – –
Department Public Works
Service / Program Equipment
Project Name Unit 42 Replacement
Work In Progress (WIP) Yes Previous project # 2024-401
Project Description / Need for Work
Replace Unit 42 which is a 2011 Dodge 5500 This project was approved as part of the 2023 Capital Budget. Council approved Bayview Chryslers bid for the Chassis ($84,320.00 including HST). Cab and Chasis has been delivered in 2024. Custom tool boxes and crane are currently in production and complete unit is expected to be delivered in 2025. This is a a carry-over from 2024 approved budget item
Comments
Useful Live (Years) 15 years
Financing:
External Sources
Grants/Subsidies –
Direct Development Contrib. –
External contribution –
Others (Fundraising) –
Revenue Fund
From Operations (tax base) –
From Operations (User rates) –
Reserves/Reserve Funds
General reserves –
Equipment reserves 240,000.00 240,000.00
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 240,000.00 240,000.00 – – – –
Department Public Works
Service / Program Equipment
Project Name Two – Pickup Truck Replacements
Work In Progress (WIP) No Previous project #
Project Description / Need for Work
Purchase of two (2) new 2025 extended cab 4×4 pick up trucks and surplus two (2) existing pickup trucks (unit no. 43 – 2018 model with 245,000km, & unit no. 06 – 2013 model with 240,000km).
Comments
Useful Live (Years) 15 years
Financing:
External Sources
Grants/Subsidies –
Direct Development Contrib. –
External contribution –
Others (Fundraising) –
Revenue Fund
From Operations (tax base) –
From Operations (User rates) –
Reserves/Reserve Funds
General reserves –
Equipment reserves 120,000.00 120,000.00
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 120,000.00 120,000.00 – – – –
Department Public Works
Service / Program Equipment
Project Name Street Sweeper Replacement
Work In Progress (WIP) No Previous project #
Project Description / Need for Work
Purchase of a new 2025 street sweeper to replace the existing 2009 Freightliner truck with Elgin Whirlwind sweep unit
Comments
Useful Live (Years) 15 years
Financing:
External Sources
Grants/Subsidies –
Direct Development Contrib. –
External contribution (Trade-in) 25,000.00 25,000.00
Others (Fundraising) –
Revenue Fund
From Operations (tax base) –
From Operations (User rates) –
Reserves/Reserve Funds
General reserves –
Equipment reserves 475,000.00 475,000.00
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 500,000.00 500,000.00 – – – –
Department Public Works
Service / Program Equipment
Project Name Mower Attachments for New Tractor
Work In Progress (WIP) No Previous project #
Project Description / Need for Work
Purchase of a new boom mower attachment (rotary blade mower), to attach to new tractor/boom unit purchased in 2024. Also purchase of a 3 pt hitch side mower to attached to the front of the same tractor unit.
Comments
Useful Live (Years) 10 years
Financing:
External Sources
Grants/Subsidies –
Direct Development Contrib. –
External contribution (Trade-in) –
Others (Fundraising) –
Revenue Fund
From Operations (tax base) –
From Operations (User rates) –
Reserves/Reserve Funds
General reserves –
Equipment reserves 75,000.00 75,000.00
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 75,000.00 75,000.00 – – – –
Department Engineering
Service/Program Wastewater
Project Name Tom Street Sewer Relocation
Work In Progress (WIP) No
Project Description/Need for Work
Relocation of Tom Street Trunk Sanitary Sewer as per the recommendation of the Environmental Assessment completed in 2023. Trunk sanitary sewer is to be relocated from the fault line on Tom Street to a new easement off Sandstone Street and Beresford Street. Sanitary sewer on Tom Street to be replaced with a smaller pipe lowering the risk of failure. Due to staffing constraints, design engineer is proposed to complete inspection and contract adminitstration.
Financing:
Comments
Risk of failure
External Sources
Grants/Subsidies –
Direct Development Contrib. –
External contribution –
Others (Fundraising) –
Revenue Fund
From Operations (tax base) –
From Operations (User rates) –
Reserves/Reserve Funds
Wastewater reserves 1,644,500.00 1,644,500.00 –
Equipment reserves –
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 1,644,500.00 1,644,500.00 – – – –
Department Public Works
Service / Program Wastewater Collection
Project Name Baptist, Holt Line and Brigden Main Pump Station Rehab
Work In Progress (WIP) Yes/No Previous project # No
Project Description / Need for Work
The pump stations require rehabilitation due to age and excessive corrosion, the plan is to complete the design work in 2025
and then complete the rehabilitaion work in 2026
Project Priority
Indicate High/Medium/Low Comments
Health or Safety Issues High
Cost Saving / Paybacks
Asset Maintenance/Replacement High
Growth Related Needs
Service Enhancement High
Other
Useful Live (Years) 25 years
Financing:
External Sources
Grants/Subsidies –
Direct Development Contrib. –
External contribution –
Others (Fundraising) –
Revenue Fund
From Operations (tax base) –
From Operations (User rates) –
Reserves/Reserve Funds
Wastewater reserves 880,000.00 80,000.00 800,000.00
Equipment reserves –
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 880,000.00 80,000.00 800,000.00 – – –
Department Public Works
Service / Program Wastewater
Project Name Courtright WWTP Expansion
Work In Progress (WIP) No Previous project #
Project Description / Need for Work
The existing wastewater treatment plant has reached capacity and requires expansion to treat future growth in the Township. This project includes the consulting & contracting costs related to the completion of detailed design and construction of the Courtright WWTP Expansion.
Comments
Useful Live (Years) years
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies –
Land –
Asset Purchase 34,019,996.00 15,776,926.00 18,243,070.00
Utilities/Design 3,120,000.00 3,120,000.00
Furnishing/Equipment –
Sitework/Landscaping –
Contingency 9,260,004.00 4,295,714.00 4,964,290.00
Interim Financing Cost –
Other
–
Total Expenditures 46,400,000.00 3,120,000.00 20,072,640.00 23,207,360.00 – –
Financing:
External Sources
Grants/Subsidies 33,872,000.00 3,120,000.00 14,260,900.80 16,491,099.20
Direct Development Contrib. –
External contribution –
Others (Fundraising) –
Revenue Fund
From Operations (tax base) –
From Operations (User rates) –
Reserves/Reserve Funds
General reserves –
Equipment reserves –
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture 12,528,000.00 5,811,739.20 6,716,260.80
Lease –
Total Financing 46,400,000.00 3,120,000.00 20,072,640.00 23,207,360.00 – –
Department Engineering
Service/Program Water
Project Name Tom Street Sewer Relocation
Work In Progress (WIP) No
Project Description/Need for Work
As part of the Tom Street Sanitary Sewer Relocation project, the ductile iron watermain along Tom Street should be upgraded to eliminate infrastructure with short remaining useful life. The engineering department has prioritized the elimination of ductile iron watermain and the Tom Street project is a great opportunity to continue doing so.
Comments
Useful Live (Years) 75
Total
Project Budget Expenditures/ Year 1 Year 2 Year 3 Year 4 Year 5
Financing 2025 2026 2027 2028 2029
Expenditures:
Studies
Land –
Asset Purchase 250,000.00
Utilties/Design 37,500.00
Furnishing/Equipment
Sitework/Landscaping –
Contingency –
Interim Financing Cost –
Other –
–
Total Expenditures 287,500.00 287,500.00 – – – –
Financing:
External Sources
Grants/Subsidies –
Direct Development Contrib. –
External contribution –
Others (Fundraising) –
Revenue Fund
From Operations (tax base) –
From Operations (User rates) –
Reserves/Reserve Funds
Water Reserves 287,500.00 287,500.00 –
Equipment reserves –
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 287,500.00 287,500.00 – – – –
Department Public Works
Service / Program Water
Project Name Duncan Street Watermain Replacement
Work In Progress (WIP) No
Project Description / Need for Work
This project includes the replacement of existing 150mm ductile iron watermain on Duncan Street from Jane Street to Steadman Street. The Township has made efforts to eliminate all ductile iron watermain in the Township and this section should be replaced as part of the Steadman Street and Duncan Street reconstruction projects.
Comments
Useful Live (Years) 75 years
Financing:
External Sources
Grants/Subsidies –
Direct Development Contrib. –
External contribution –
Others (Fundraising) –
Revenue Fund
From Operations (tax base) –
From Operations (User rates) –
Reserves/Reserve Funds
Water reserves 220,000.00
Equipment reserves –
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 220,000.00 – – – – –
Department Public Works
Service / Program Water
Project Name Nova St. Clair Water Service Installation
Work In Progress (WIP) Yes Previous project # 2023-605
Project Description / Need for Work
We need to install a meter pit and backflow preventor at the LAWSS Watermain Easment. Unmetered leaks have prioritized
the installation of a new meter chamber at the connection. This is a carry over project that requires additional funds.
Project Priority
Indicate High/Medium/Low Comments
Useful Live (Years) 20 years
Financing:
External Sources
Grants/Subsidies –
Direct Development Contrib. –
External contribution –
Others (Fundraising) –
Revenue Fund
From Operations (tax base) –
From Operations (User rates) –
Reserves/Reserve Funds
Water reserves 120,000.00 120,000.00
Equipment reserves –
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 120,000.00 120,000.00 – – – –
Department Public Works
Service / Program Water Distribution
Project Name Brigden Water Tower Access Road and Storm Pipe Repairs
Work In Progress (WIP) Yes/No Previous project # NO
Project Description / Need for Work
Replacement of the storm catch basin and storm pipes are required. The access road is at end of life and needs to be replaced
Project Priority
Indicate High/Medium/Low Comments
Project Budget
Expenditures:
Studies
Land
Asset Purchase
Utilities/Design
Furnishing/Equipment
Sitework/Landscaping
Contingency
Interim Financing Cost
Other
Total Expenditures
Financing:
The uneven asphalt is a safety hazard for users Asset is at end of life needs replacement Access to the site will be improved
External Sources
Grants/Subsidies –
Direct Development Contrib. –
External contribution –
Others (Fundraising) –
Revenue Fund
From Operations (tax base) –
From Operations (User rates) –
Reserves/Reserve Funds
Water reserves 150,000.00 150,000.00
Equipment reserves –
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 150,000.00 150,000.00 – – – –
Township of St. Clair Capital Project # 2025-
Capital Budget Data Collection Information Sheet – Year 2025 -2030
Department Public Works
Service / Program Water Distribution
Project Name Pressure Monitoring Equipment
Work In Progress (WIP) Yes/No Previous project # NO
Project Description / Need for Work
Our water master plan has identified 6 recommended locations in our distribution system to install pressure monitoring equipment.
Our plan is to design and install the first of 6 pressure monitors in 2025.
Project Priority
Indicate High/Medium/Low Comments
Useful Live (Years) 10 years
Financing:
External Sources
Grants/Subsidies –
Direct Development Contrib. –
External contribution –
Others (Fundraising) –
Revenue Fund
From Operations (tax base) –
From Operations (User rates) –
Reserves/Reserve Funds
Water reserves 190,000.00 190,000.00
Equipment reserves –
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 190,000.00 190,000.00 – – – –
Department Public Works
Service / Program Water Meter Billing
Project Name Water Meter Reding Equipment
Work In Progress (WIP) Yes/No Previous project # NO
Project Description / Need for Work
We need to purchase new water meter reading equipment. Our current equipment needs to be replaced.
Project Priority
Indicate High/Medium/Low Comments
Need to replace existing equipment
Useful Live (Years) 10 years
Financing:
External Sources
Grants/Subsidies –
Direct Development Contrib. –
External contribution –
Others (Fundraising) –
Revenue Fund
From Operations (tax base) –
From Operations (User rates) –
Reserves/Reserve Funds
Water reserves 55,000.00 55,000.00
Equipment reserves –
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 55,000.00 55,000.00 – – – –
Department Public Works
Service / Program Asset Management
Project Name Asset Management Plan Update
Work In Progress (WIP) No Previous project #
Project Description / Need for Work
Hire a consultant to assist the Township to meet the Ontario Reg. 588/17 which identifies that the asset management plan is required to be updated to capture a proposed LOS for all asset classes for 10 years which will include a lifecycle management plan, financial strategy and risk assessment. These updates are to be completed by July, 2025.
Health or Safety Issues
Cost Saving / Paybacks
Asset Maintenance/Replacement High
Growth Related Needs
Service Enhancement
Other
Useful Live (Years) years
Comments
Regulatory Requirement for AM Plan
Financing:
External Sources
Grants/Subsidies –
Direct Development Contrib. –
External contribution –
Others (Fundraising) –
Revenue Fund
From Operations (tax base) 90,000.00 90,000.00
From Operations (User rates) –
Reserves/Reserve Funds
General reserves –
Equipment reserves –
DC reserves –
Other -St. Clair Educ. & Envir. –
Long Term Financing
Debenture –
Lease –
Total Financing 90,000.00 90,000.00 – – – –